IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0321 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,508 $9,090 Implemented
WV0321 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,125 $454 Implemented
WV0321 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,363 $25 Implemented
WV0321 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,363 $2,650 Implemented
WV0321 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,340 $210 Not Implemented
WV0321 # 08 Y:2005 08 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,323 $1,782 Not Implemented
WV0321 # 09 Y:2005 09 2005 DEVELOP A REPAIR/REPLACE POLICY $875 $312 Implemented
WV0321 # 10 Y:2005 10 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $532 $140 Not Implemented
MI0113 # 01 Y:2005 01 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,712 $52,535 Implemented
MI0113 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,230 $435 Implemented
MI0113 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $7,248 $1,138 Not Implemented
MI0113 # 04 Y:2005 04 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $5,163 $17,100 Implemented
MI0113 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $1,868 $975 Not Implemented
SF0311 # 01 Y:2005 01 2005 REPAIR AND ELIMINATE STEAM LEAKS $133,918 $0 Implemented
SF0311 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,048 $0 Implemented
SF0311 # 03 Y:2005 03 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,110 $0 Not Implemented
SF0311 # 04 Y:2005 04 2005 REPAIR OR REPLACE STEAM TRAPS $24,768 $2,108 Implemented
SF0311 # 05 Y:2005 05 2005 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,622 $504 Not Implemented
SF0311 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,803 $2,959 Not Implemented
SF0311 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,363 $6,375 Implemented
SF0311 # 08 Y:2005 08 2005 USE PHOTOCELL CONTROLS $412 $480 Not Implemented
SF0311 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,804 $2,332 Not Implemented
SF0311 # 10 Y:2005 10 2005 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $3,402 $5,030 Not Implemented
SF0311 # 11 Y:2005 11 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $456 $693 Not Implemented
SF0311 # 12 Y:2005 12 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,102 $18,405 Not Implemented