IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0743 # 05 Y:2006 05 2006 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $54,177 $17,700 Not Implemented
UD0743 # 06 Y:2006 06 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,328 $0 Implemented
UD0743 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,000 $1,800 Implemented
UD0743 # 08 Y:2006 08 2006 REPAIR OR REPLACE STEAM TRAPS $18,000 $1,750 Implemented
UD0743 # 09 Y:2006 09 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $17,000 $0 Implemented
UD0743 # 10 Y:2006 10 2006 REDUCE EXCESSIVE BOILER BLOWDOWN $15,000 $0 Implemented
UD0743 # 11 Y:2006 11 2006 USE OPTIMUM TEMPERATURE $13,681 $0 Not Implemented
UD0743 # 12 Y:2006 12 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,125 $12,000 Not Implemented
UD0743 # 13 Y:2006 13 2006 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $8,946 $0 Not Implemented
UD0743 # 14 Y:2006 14 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,158 $15,600 Not Implemented
UD0743 # 15 Y:2006 15 2006 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE $4,060 $10,000 Not Implemented
UD0743 # 16 Y:2006 16 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,181 $12,130 Not Implemented
UD0743 # 17 Y:2006 17 2006 USE PHOTOCELL CONTROLS $2,428 $1,776 Not Implemented
UD0743 # 18 Y:2006 18 2006 USE PHOTOCELL CONTROLS $2,147 $0 Not Implemented
UD0743 # 19 Y:2006 19 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,710 $0 Not Implemented
UD0743 # 20 Y:2006 20 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,342 $500 Implemented
UD0743 # 21 Y:2006 21 2006 UPGRADE CONTROLS ON COMPRESSORS $831 $0 Implemented
AS0425 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $11,573 $500 Implemented
AS0425 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,372 $15,000 Implemented
AS0425 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,670 $1,000 Not Implemented
AS0425 # 04 Y:2006 04 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $382 $99 Implemented
LL0260 # 01 Y:2006 01 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $11,704 $5,420 Implemented
LL0260 # 02 Y:2006 02 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $7,890 $5,109 Not Implemented
LL0260 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,503 $3,652 Not Implemented
LL0260 # 04 Y:2006 04 2006 USE PHOTOCELL CONTROLS $3,127 $630 Not Implemented