IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0453 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $70,484 $4,500 Implemented
LE0453 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,972 $1,125 Not Implemented
LE0453 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $7,248 $4,000 Not Implemented
LE0453 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $1,037 $1,550 Not Implemented
LE0453 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,499 $3,938 Implemented
LE0453 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,507 $11,250 Implemented
LE0453 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,514 $19,688 Implemented
LE0453 # 08 Y:2018 08 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $27,940 $105,000 Not Implemented
UF0516 # 01 Y:2018 01 2018 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $120,914 $400,000 Not Implemented
UF0516 # 02 Y:2018 02 2018 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,142 $18,013 Implemented
UF0516 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,159 $12,014 Implemented
UF0516 # 04 Y:2018 04 2018 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $200,000 $100,000 Not Implemented
UF0516 # 05 Y:2018 05 2018 MOVE PRODUCT USING MECHANICAL MEANS $42,000 $70,000 Implemented
UF0516 # 06 Y:2018 06 2018 INSTALL EQUIPMENT TO MOVE PRODUCT $30,207 $5,350 Not Implemented
UF0516 # 07 Y:2018 07 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $23,725 $10,695 Not Implemented
MZ0255 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $47,570 $16,500 Implemented
MZ0255 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $19,908 $25,000 Not Implemented
MZ0255 # 03 Y:2018 03 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,288 $1,000 Implemented
MZ0255 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,910 $1,540 Implemented
MZ0255 # 05 Y:2018 05 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,457 $3,200 Not Implemented
MZ0255 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,260 $100 Not Implemented
MZ0255 # 07 Y:2018 07 2018 INSTALL OCCUPANCY SENSORS $1,086 $280 Implemented
MZ0255 # 08 Y:2018 08 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $938 $225 Implemented
WM0120 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,818 $35,678 Implemented
WM0120 # 02 Y:2018 02 2018 USE RADIANT HEATER FOR SPOT HEATING $18,564 $28,796 Not Implemented