Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,756
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0453 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $70,484 | $4,500 | Implemented |
LE0453 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,972 | $1,125 | Not Implemented |
LE0453 # 03 Y:2018 | 03 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,248 | $4,000 | Not Implemented |
LE0453 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $1,037 | $1,550 | Not Implemented |
LE0453 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,499 | $3,938 | Implemented |
LE0453 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,507 | $11,250 | Implemented |
LE0453 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,514 | $19,688 | Implemented |
LE0453 # 08 Y:2018 | 08 | 2018 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $27,940 | $105,000 | Not Implemented |
UF0516 # 01 Y:2018 | 01 | 2018 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $120,914 | $400,000 | Not Implemented |
UF0516 # 02 Y:2018 | 02 | 2018 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $6,142 | $18,013 | Implemented |
UF0516 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,159 | $12,014 | Implemented |
UF0516 # 04 Y:2018 | 04 | 2018 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $200,000 | $100,000 | Not Implemented |
UF0516 # 05 Y:2018 | 05 | 2018 | MOVE PRODUCT USING MECHANICAL MEANS | $42,000 | $70,000 | Implemented |
UF0516 # 06 Y:2018 | 06 | 2018 | INSTALL EQUIPMENT TO MOVE PRODUCT | $30,207 | $5,350 | Not Implemented |
UF0516 # 07 Y:2018 | 07 | 2018 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $23,725 | $10,695 | Not Implemented |
MZ0255 # 01 Y:2018 | 01 | 2018 | OPTIMIZE PLANT POWER FACTOR | $47,570 | $16,500 | Implemented |
MZ0255 # 02 Y:2018 | 02 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $19,908 | $25,000 | Not Implemented |
MZ0255 # 03 Y:2018 | 03 | 2018 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,288 | $1,000 | Implemented |
MZ0255 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,910 | $1,540 | Implemented |
MZ0255 # 05 Y:2018 | 05 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,457 | $3,200 | Not Implemented |
MZ0255 # 06 Y:2018 | 06 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,260 | $100 | Not Implemented |
MZ0255 # 07 Y:2018 | 07 | 2018 | INSTALL OCCUPANCY SENSORS | $1,086 | $280 | Implemented |
MZ0255 # 08 Y:2018 | 08 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $938 | $225 | Implemented |
WM0120 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,818 | $35,678 | Implemented |
WM0120 # 02 Y:2018 | 02 | 2018 | USE RADIANT HEATER FOR SPOT HEATING | $18,564 | $28,796 | Not Implemented |