IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,193

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0325 # 04 Y:2007 04 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,212 $0 Implemented
UM0325 # 05 Y:2007 05 2007 INSULATE BARE EQUIPMENT $7,856 $4,379 Not Implemented
UM0325 # 06 Y:2007 06 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,729 $1,620 Implemented
UM0325 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,586 $2,640 Not Implemented
UM0325 # 08 Y:2007 08 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,151 $1,000 Not Implemented
UM0325 # 09 Y:2007 09 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $701 $400 Not Implemented
UM0324 # 01 Y:2007 01 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,396 $2,140 Not Implemented
UM0324 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $5,954 $543 Not Implemented
UM0324 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,631 $4,000 Not Implemented
UM0324 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,978 $0 Implemented
UM0324 # 05 Y:2007 05 2007 OPTIMIZE PLANT POWER FACTOR $7,222 $6,917 Implemented
UM0323 # 01 Y:2007 01 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,469 $3,500 Implemented
UM0323 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $7,978 $1,000 Implemented
UM0323 # 03 Y:2007 03 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,247 $2,653 Implemented
UM0323 # 04 Y:2007 04 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $6,815 $500 Implemented
UM0323 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,347 $8,175 Implemented
UM0323 # 06 Y:2007 06 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,157 $1,836 Implemented
UM0323 # 07 Y:2007 07 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,934 $6,822 Not Implemented
UM0323 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,360 $100 Not Implemented
UM0323 # 09 Y:2007 09 2007 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,628 $4,248 Implemented
UM0323 # 10 Y:2007 10 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,122 $1,000 Implemented
UM0323 # 11 Y:2007 11 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $946 $1,000 Implemented
UM0323 # 12 Y:2007 12 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $615 $75 Implemented
UM0323 # 13 Y:2007 13 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $513 $206 Implemented
UM0322 # 01 Y:2007 01 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $43,338 $0 Implemented