IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,642

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0056 # 08 Y:2010 08 2010 RECOVER WASTE HEAT FROM EQUIPMENT $99,250 $80,000 Not Implemented
MZ0056 # 09 Y:2010 09 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,237 $1,300 Not Implemented
MZ0056 # 10 Y:2010 10 2010 REPAIR OR REPLACE STEAM TRAPS $113,700 $100,000 Not Implemented
MZ0053 # 01 Y:2010 01 2010 REPLACE BOILER $33,880 $115,000 Implemented
MZ0053 # 02 Y:2010 02 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $959 $1,000 Implemented
MZ0053 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $22,455 $10,000 Implemented
MZ0053 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,022 $33,660 Implemented
MZ0053 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $888 $1,550 Implemented
MZ0053 # 06 Y:2010 06 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $987 $0 Implemented
MZ0053 # 07 Y:2010 07 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,342 $1,160 Implemented
MZ0053 # 08 Y:2010 08 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,601 $0 Implemented
MZ0053 # 09 Y:2010 09 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,207 $0 Implemented
MZ0053 # 10 Y:2010 10 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,916 $1,100 Implemented
MZ0053 # 11 Y:2010 11 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,987 $5,000 Implemented
MZ0051 # 01 Y:2010 01 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,697 $1,160 Not Implemented
MZ0051 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,304 $73,650 Not Implemented
MZ0051 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $2,823 $2,850 Not Implemented
MZ0051 # 04 Y:2010 04 2010 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $2,580 $1,800 Not Implemented
MZ0051 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,963 $0 Not Implemented
MZ0051 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,408 $0 Not Implemented
MZ0051 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $544 $400 Not Implemented
MZ0051 # 08 Y:2010 08 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,123 $800 Not Implemented
MZ0051 # 09 Y:2010 09 2010 RECOVER WASTE HEAT FROM EQUIPMENT $32,817 $10,000 Not Implemented
MZ0050 # 01 Y:2010 01 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,053 $1,160 Not Implemented
MZ0050 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $2,616 $0 Implemented