Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,175
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0087 # 07 Y:1987 | 07 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $421 | $500 | Implemented |
CO0087 # 08 Y:1987 | 08 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,040 | $200 | Implemented |
CO0087 # 09 Y:1987 | 09 | 1987 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $1,378 | $2,829 | Not Implemented |
CO0087 # 10 Y:1987 | 10 | 1987 | INSTALL / REPAIR INSULATION ON STEAM LINES | $155 | $347 | Implemented |
CO0087 # 11 Y:1987 | 11 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $586 | $366 | Implemented |
CO0088 # 01 Y:1987 | 01 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,886 | $2,200 | Implemented |
CO0088 # 02 Y:1987 | 02 | 1987 | TURN OFF EQUIPMENT WHEN NOT IN USE | $799 | $700 | Not Implemented |
CO0088 # 03 Y:1987 | 03 | 1987 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,180 | $1,020 | Not Implemented |
CO0088 # 04 Y:1987 | 04 | 1987 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,431 | $3,200 | Implemented |
CO0088 # 05 Y:1987 | 05 | 1987 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,852 | $5,000 | Not Implemented |
CO0088 # 06 Y:1987 | 06 | 1987 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $13,610 | $30,000 | Not Implemented |
CO0088 # 07 Y:1987 | 07 | 1987 | USE RADIANT HEATER FOR SPOT HEATING | $11,670 | $40,000 | Not Implemented |
CO0088 # 08 Y:1987 | 08 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $982 | $500 | Implemented |
CO0088 # 09 Y:1987 | 09 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,794 | $500 | Implemented |
CO0088 # 10 Y:1987 | 10 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,575 | $6,500 | Not Implemented |
CO0088 # 11 Y:1987 | 11 | 1987 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,380 | $2,000 | Implemented |
CO0088 # 12 Y:1987 | 12 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,873 | $720 | Implemented |
CO0089 # 01 Y:1987 | 01 | 1987 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,416 | $21 | Implemented |
CO0089 # 02 Y:1987 | 02 | 1987 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $2,026 | $150 | Implemented |
CO0089 # 03 Y:1987 | 03 | 1987 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,537 | $500 | Implemented |
CO0089 # 04 Y:1987 | 04 | 1987 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $8,540 | $3,000 | Not Implemented |
CO0089 # 05 Y:1987 | 05 | 1987 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $726 | $300 | Implemented |
CO0089 # 06 Y:1987 | 06 | 1987 | INSTALL TIMERS AND/OR THERMOSTATS | $13,198 | $0 | Implemented |
CO0089 # 07 Y:1987 | 07 | 1987 | USE RADIANT HEATER FOR SPOT HEATING | $50,245 | $180,000 | Not Implemented |
CO0089 # 08 Y:1987 | 08 | 1987 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $19,113 | $24,000 | Implemented |