IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0426 # 11 Y:2008 11 2008 REUSE / RECYCLE/ SELL PAPER PRODUCTS $28,890 $8,900 Implemented
LL0295 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $95,128 $96,000 Not Implemented
LL0295 # 02 Y:2008 02 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,831 $1,500 Not Implemented
LL0295 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,016 $760 Implemented
LL0295 # 04 Y:2008 04 2008 USE PHOTOCELL CONTROLS $2,258 $210 Not Implemented
LL0295 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $586 $350 Not Implemented
LL0295 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $422 $180 Not Implemented
LL0295 # 07 Y:2008 07 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $273 $319 Not Implemented
LL0295 # 08 Y:2008 08 2008 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $265 $152 Implemented
OK0765 # 01 Y:2008 01 2008 INSTALL OCCUPANCY SENSORS $1,794 $2,151 Not Implemented
OK0765 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $340 $0 Implemented
OK0765 # 03 Y:2008 03 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,600 $0 Not Implemented
OK0765 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,176 $4,690 Not Implemented
OK0765 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,974 $18,623 Implemented
OK0765 # 06 Y:2008 06 2008 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $42,105 $161,000 Implemented
UD0782 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $28,951 $0 Implemented
UD0782 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $5,748 $6,528 Implemented
UD0782 # 03 Y:2008 03 2008 USE RADIANT HEATER FOR SPOT HEATING $5,068 $20,000 Not Implemented
UD0782 # 04 Y:2008 04 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,245 $0 Implemented
UD0782 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,643 $0 Not Implemented
UD0782 # 06 Y:2008 06 2008 ADD AREA LIGHTING SWITCHES $3,233 $10,000 Implemented
UD0782 # 07 Y:2008 07 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,243 $1,800 Implemented
UD0782 # 08 Y:2008 08 2008 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,292 $2,000 Not Implemented
UD0782 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,907 $1,000 Implemented
WV0379 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $72,979 $113,775 Implemented