Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,715
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0164 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,676 | $3,494 | Not Implemented |
OK0944 # 01 Y:2016 | 01 | 2016 | INSTALL OCCUPANCY SENSORS | $914 | $1,425 | Not Implemented |
OK0944 # 02 Y:2016 | 02 | 2016 | INSTALL OCCUPANCY SENSORS | $366 | $835 | Not Implemented |
OK0944 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,324 | $18,000 | Not Implemented |
OK0944 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,222 | $1,107 | Implemented |
OK0944 # 05 Y:2016 | 05 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,916 | $0 | Not Implemented |
UD0950 # 01 Y:2016 | 01 | 2016 | IMPROVE COMBUSTION CONTROL CAPABILITY | $5,935 | $5,000 | Not Implemented |
UD0950 # 02 Y:2016 | 02 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,008 | $10,000 | Not Implemented |
UD0950 # 03 Y:2016 | 03 | 2016 | INSTALL TURBULATORS | $1,055 | $1,875 | Not Implemented |
UD0950 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,050 | $671 | Not Implemented |
UD0950 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $671 | $1,116 | Not Implemented |
UD0950 # 06 Y:2016 | 06 | 2016 | REDUCE EXCESSIVE BOILER BLOWDOWN | $195 | $0 | Not Implemented |
UD0950 # 07 Y:2016 | 07 | 2016 | INSTALL AUTOMATIC STACK DAMPER | $424 | $484 | Not Implemented |
UD0950 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $4,004 | $1,452 | Not Implemented |
UD0950 # 09 Y:2016 | 09 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,530 | $4,047 | Not Implemented |
UD0950 # 10 Y:2016 | 10 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $240 | $460 | Implemented |
UD0950 # 11 Y:2016 | 11 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $335 | $1,000 | Implemented |
UD0950 # 12 Y:2016 | 12 | 2016 | OPTIMIZE PLANT POWER FACTOR | $1,295 | $6,540 | Not Implemented |
UD0950 # 13 Y:2016 | 13 | 2016 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $7,880 | $0 | Implemented |
IP0069 # 01 Y:2016 | 01 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $490 | $0 | Implemented |
IP0069 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,282 | $21 | Implemented |
IP0069 # 03 Y:2016 | 03 | 2016 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $5,637 | $3 | Not Implemented |
IP0069 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $9,327 | $377 | Implemented |
IP0069 # 05 Y:2016 | 05 | 2016 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $50 | $5 | Not Implemented |
IP0069 # 06 Y:2016 | 06 | 2016 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,989 | $215 | Implemented |