IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,642

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0337 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $330 $820 Not Implemented
MZ0337 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,882 $6,873 Implemented
MZ0337 # 06 Y:2023 06 2023 IMPROVE SPACE COMFORT CONDITIONING $150,000 $75,650 Implemented
MZ0338 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $576,991 $4,487,250 Not Implemented
MZ0338 # 02 Y:2023 02 2023 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,823 $860 Implemented
MZ0338 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $2,124 $3,920 Implemented
MZ0338 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $60,112 $127,747 Implemented
MZ0338 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,644 $13,800 Implemented
MZ0338 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,195 $240 Not Implemented
MZ0340 # 01 Y:2023 01 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,529 $720 Implemented
MZ0340 # 02 Y:2023 02 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $3,688 $320 Implemented
MZ0340 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,810 $3,202 Not Implemented
MZ0340 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $618 $260 Implemented
MZ0340 # 05 Y:2023 05 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,940 $4,520 Not Implemented
MZ0340 # 06 Y:2023 06 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,084 $18,000 Not Implemented
MZ0340 # 07 Y:2023 07 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $188,061 $900,000 Not Implemented
MZ0340 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,531 $5,336 Implemented
MZ0339 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,822 $6,511 Not Implemented
MZ0339 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,100 $8,100 Implemented
MZ0339 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $440 $450 Not Implemented
MZ0339 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $196 $289 Not Implemented
MZ0339 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $536 $1,120 Implemented
MZ0336 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $1,963 $2,020 Implemented
MZ0336 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,175 $53,900 Implemented
MZ0336 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $774 $0 Not Implemented