IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

894

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0649 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,617 $63,000 Not Implemented
MA0649 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,212 $10,500 Not Implemented
MA0649 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $2,945 $3,000 Implemented
MA0647 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,325 $30,000 Not Implemented
MA0647 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,543 $1,200 Implemented
MA0647 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $458 $0 Not Implemented
MA0647 # 04 Y:2009 04 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $372 $400 Not Implemented
MA0642 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,279 $27,924 Implemented
MA0642 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $4,095 $4,354 Not Implemented
MA0642 # 03 Y:2008 03 2008 REDUCE VENTILATION AIR $3,315 $1,000 Not Implemented
MA0642 # 04 Y:2008 04 2008 OPTIMIZE PLANT POWER FACTOR $1,935 $6,500 Not Implemented
MA0642 # 05 Y:2008 05 2008 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,273 $5,500 Not Implemented
MA0642 # 06 Y:2008 06 2008 OPTIMIZE PLANT POWER FACTOR $391 $900 Not Implemented
MA0642 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $251 $120 Implemented
MA0620 # 01 Y:2007 01 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $84,828 $100,250 Not Implemented
MA0620 # 02 Y:2007 02 2007 HEAT WATER WITH EXHAUST HEAT $25,021 $44,540 Implemented
MA0620 # 03 Y:2007 03 2007 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $23,390 $85,000 Not Implemented
MA0620 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,535 $24,820 Implemented
MA0620 # 05 Y:2007 05 2007 INSTALL TIMERS AND/OR THERMOSTATS $9,514 $1,776 Implemented
MA0620 # 06 Y:2007 06 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,532 $8,100 Implemented
MA0620 # 07 Y:2007 07 2007 USE RADIANT HEATER FOR SPOT HEATING $7,012 $10,990 Not Implemented
MA0620 # 08 Y:2007 08 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,784 $20,175 Not Implemented
MA0620 # 09 Y:2007 09 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,751 $3,025 Implemented
MA0620 # 10 Y:2007 10 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,323 $6,022 Implemented
MA0619 # 01 Y:2007 01 2007 INSTALL AN UNINTERUPTABLE POWER SUPPLY $227,962 $1,200,000 Not Implemented