Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,582
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0231 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $15,898 | $263,547 | Implemented |
UU0229 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $14,527 | $5,600 | Implemented |
UU0229 # 02 Y:2023 | 02 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $11,440 | $3,816 | Not Implemented |
UU0229 # 03 Y:2023 | 03 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $4,945 | $3,480 | Implemented |
UU0229 # 04 Y:2023 | 04 | 2023 | USE OPTIMUM TEMPERATURE | $2,146 | $3,060 | Implemented |
UU0234 # 01 Y:2023 | 01 | 2023 | ISOLATE HOT OR COLD EQUIPMENT | $6,940 | $1,552 | Implemented |
UU0234 # 02 Y:2023 | 02 | 2023 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $6,263 | $1,210 | Implemented |
UU0234 # 03 Y:2023 | 03 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $90 | $400 | Implemented |
UU0234 # 04 Y:2023 | 04 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $63 | $305 | Not Implemented |
UU0227 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $14,399 | $40,790 | Not Implemented |
UU0227 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,169 | $10,776 | Implemented |
UU0227 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,325 | $78,840 | Implemented |
UU0227 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,103 | $7,349 | Implemented |
UU0227 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,358 | $13,337 | Implemented |
UU0227 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,776 | $3,465 | Implemented |
UU0227 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,564 | $7,061 | Implemented |
UU0227 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $4,289 | $9,282 | Implemented |
UU0227 # 09 Y:2023 | 09 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,237 | $6,000 | Implemented |
UU0227 # 10 Y:2023 | 10 | 2023 | MINIMIZE WATER USAGE | $2,457 | $2,652 | Implemented |
UU0227 # 11 Y:2023 | 11 | 2023 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $2,160 | $2,000 | Not Implemented |
UU0227 # 12 Y:2023 | 12 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $53 | $333 | Implemented |
UU0232 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,942 | $26,160 | Implemented |
UU0232 # 02 Y:2023 | 02 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $5,219 | $12,000 | Implemented |
UU0232 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,208 | $2,720 | Not Implemented |
UU0232 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $909 | $425 | Implemented |