IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0231 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $15,898 $263,547 Implemented
UU0229 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $14,527 $5,600 Implemented
UU0229 # 02 Y:2023 02 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,440 $3,816 Not Implemented
UU0229 # 03 Y:2023 03 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $4,945 $3,480 Implemented
UU0229 # 04 Y:2023 04 2023 USE OPTIMUM TEMPERATURE $2,146 $3,060 Implemented
UU0234 # 01 Y:2023 01 2023 ISOLATE HOT OR COLD EQUIPMENT $6,940 $1,552 Implemented
UU0234 # 02 Y:2023 02 2023 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,263 $1,210 Implemented
UU0234 # 03 Y:2023 03 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $90 $400 Implemented
UU0234 # 04 Y:2023 04 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $63 $305 Not Implemented
UU0227 # 01 Y:2023 01 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $14,399 $40,790 Not Implemented
UU0227 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,169 $10,776 Implemented
UU0227 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,325 $78,840 Implemented
UU0227 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,103 $7,349 Implemented
UU0227 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,358 $13,337 Implemented
UU0227 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,776 $3,465 Implemented
UU0227 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,564 $7,061 Implemented
UU0227 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $4,289 $9,282 Implemented
UU0227 # 09 Y:2023 09 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,237 $6,000 Implemented
UU0227 # 10 Y:2023 10 2023 MINIMIZE WATER USAGE $2,457 $2,652 Implemented
UU0227 # 11 Y:2023 11 2023 CHECK FOR ACCURACY OF UTILITY / POWER METERS $2,160 $2,000 Not Implemented
UU0227 # 12 Y:2023 12 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $53 $333 Implemented
UU0232 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,942 $26,160 Implemented
UU0232 # 02 Y:2023 02 2023 AIR CONDITION ONLY SPACE NECESSARY $5,219 $12,000 Implemented
UU0232 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $1,208 $2,720 Not Implemented
UU0232 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $909 $425 Implemented