IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,500

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0590 # 11 Y:2020 11 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $1,693 $1,000 Implemented
WV0590 # 10 Y:2020 10 2020 OPTIMIZE PLANT POWER FACTOR $2,899 $8,000 Not Implemented
WV0590 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,957 $813 Implemented
WV0590 # 08 Y:2020 08 2020 RECYCLE WHITE WATER $3,957 $8,600 Not Implemented
WV0590 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,881 $1,468 Implemented
WV0590 # 06 Y:2020 06 2020 UPGRADE CONTROLS ON COMPRESSORS $9,428 $15,500 Not Implemented
WV0590 # 01 Y:2020 01 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $42,278 $44,000 Not Implemented
WV0590 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,451 $66,168 Implemented
WV0590 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $24,406 $31,200 Not Implemented
WV0590 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $16,468 $5,109 Implemented
NC0645 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,683 $40,000 Implemented
NC0645 # 02 Y:2020 02 2020 RECOVER WASTE HEAT FROM EQUIPMENT $51,058 $178,000 Not Implemented
NC0645 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,505 $5,000 Not Implemented
NC0641 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,164 $120 Not Implemented
NC0641 # 02 Y:2019 02 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,554 $21,000 Not Implemented
NC0641 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $29,143 $35,000 Implemented
NC0641 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,183 $16,246 Not Implemented
WV0586 # 01 Y:2019 01 2019 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $110,861 $242,750 Not Implemented
WV0586 # 02 Y:2019 02 2019 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $31,539 $1,630 Implemented
WV0586 # 03 Y:2019 03 2019 DEVELOP A REPAIR/REPLACE POLICY $3,336 $894 Implemented
WV0586 # 04 Y:2019 04 2019 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $3,276 $11,875 Not Implemented
WV0586 # 05 Y:2019 05 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,701 $1,000 Implemented
WV0586 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,909 $2,793 Implemented
WV0586 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,900 $0 Not Implemented
NC0633 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,586 $6,135 Not Implemented