IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,629

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0135 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $598 $40 Implemented
MA0135 # 05 Y:1988 05 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,736 $1,140 Implemented
MA0135 # 06 Y:1988 06 1988 RECOVER WASTE HEAT FROM EQUIPMENT $3,813 $3,320 Not Implemented
MA0135 # 07 Y:1988 07 1988 TURN OFF EQUIPMENT WHEN NOT IN USE $2,525 $0 Implemented
MA0135 # 08 Y:1988 08 1988 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,029 $0 Implemented
MA0137 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,229 $3,020 Not Implemented
MA0137 # 02 Y:1988 02 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $588 $200 Not Implemented
MA0137 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $118 $56 Not Implemented
OK0270 # 01 Y:1988 01 1988 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,269,732 $3,600,000 Not Implemented
OK0270 # 02 Y:1988 02 1988 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $84,626 $177,400 Not Implemented
OK0270 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,950 $8,048 Implemented
OK0270 # 04 Y:1988 04 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,483 $3,750 Implemented
OK0270 # 05 Y:1988 05 1988 TURN OFF EQUIPMENT WHEN NOT IN USE $3,720 $1,400 Not Implemented
OK0271 # 01 Y:1988 01 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $307 $375 Implemented
OK0271 # 02 Y:1988 02 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,159 $1,070 Not Implemented
OK0271 # 03 Y:1988 03 1988 INSTALL TIMERS AND/OR THERMOSTATS $1,077 $1,055 Not Implemented
OK0271 # 04 Y:1988 04 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $180 $0 Implemented
OK0271 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26 $32 Implemented
OK0271 # 06 Y:1988 06 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $731 $0 Implemented
OR0034 # 01 Y:1988 01 1988 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE $975 $44 Implemented
OR0034 # 02 Y:1988 02 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,437 $835 Not Implemented
OR0034 # 03 Y:1988 03 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $1,802 $1,200 Implemented
OR0034 # 04 Y:1988 04 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $227 $300 Implemented
OR0034 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52 $137 Implemented
OR0034 # 06 Y:1988 06 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $872 $3,420 Implemented