IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0543 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,017 $28,000 Not Implemented
OR0543 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $2,107 $413 Implemented
OR0543 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $19,521 $31,119 Implemented
OR0543 # 06 Y:2008 06 2008 OPTIMIZE PLANT POWER FACTOR $10,290 $54,000 Implemented
OR0543 # 07 Y:2008 07 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,310 $148,560 Implemented
OR0543 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,510 $0 Implemented
OR0543 # 09 Y:2008 09 2008 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $78,900 $132,800 Implemented
OR0543 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,500 $43,600 Implemented
OR0543 # 11 Y:2008 11 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $52,540 $2,200 Implemented
OR0543 # 12 Y:2008 12 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $46,700 $46,700 Implemented
OR0543 # 13 Y:2008 13 2008 UPGRADE CONTROLS ON COMPRESSORS $7,300 $5,700 Implemented
OR0542 # 01 Y:2008 01 2008 Solar $112,205 $783,772 Not Implemented
OR0542 # 02 Y:2008 02 2008 Painting Operations $31,122 $1,120 Not Implemented
OR0542 # 03 Y:2008 03 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,350 $385 Not Implemented
OR0542 # 04 Y:2008 04 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,260 $6,902 Not Implemented
OR0542 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,132 $9,045 Not Implemented
OR0542 # 06 Y:2008 06 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $1,527 $0 Not Implemented
MI0174 # 01 Y:2008 01 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $214,998 $360,000 Not Implemented
MI0174 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $32,694 $2,000 Implemented
MI0174 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,544 $40 Implemented
MI0174 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,041 $1,210 Implemented
MI0174 # 05 Y:2008 05 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,087 $13,200 Not Implemented
MI0174 # 06 Y:2008 06 2008 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,075 $322 Implemented
OK0769 # 01 Y:2008 01 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $53,558 $2,347 Not Implemented
OK0769 # 02 Y:2008 02 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $18,368 $731 Not Implemented