IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0491 # 08 Y:2016 08 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,064 $500 Not Implemented
BD0491 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $778 $600 Implemented
BD0491 # 10 Y:2016 10 2016 INSULATE BARE EQUIPMENT $601 $1,800 Not Implemented
BD0491 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $209 $190 Implemented
AM0720 # 01 Y:2016 01 2016 CHECK FOR ACCURACY OF UTILITY / POWER METERS $189,624 $0 Implemented
AM0720 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,440 $2,000 Implemented
AM0720 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,170 $800 Implemented
AM0720 # 04 Y:2016 04 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,240 $0 Implemented
AM0720 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,389 $0 Not Implemented
AM0720 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,600 $5,030 Implemented
AM0720 # 07 Y:2016 07 2016 USE SYNTHETIC LUBRICANT $5,856 $0 Not Implemented
AM0720 # 08 Y:2016 08 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $760 $250 Not Implemented
AM0720 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $970 $280 Not Implemented
IP0076 # 01 Y:2016 01 2016 INSTALL TIMERS AND/OR THERMOSTATS $13,525 $18 Implemented
IP0076 # 02 Y:2016 02 2016 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $417 $0 Implemented
IP0076 # 03 Y:2016 03 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $292 $45 Implemented
IP0076 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $2,346 $2,021 Implemented
IP0076 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,878 $12,760 Implemented
WM0098 # 01 Y:2016 01 2016 USE SYNTHETIC LUBRICANT $31,522 $56 Implemented
WM0098 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,985 $6,397 Implemented
WM0098 # 03 Y:2016 03 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,494 $4,661 Not Implemented
WM0098 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,481 $0 Implemented
WM0098 # 05 Y:2016 05 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,011 $1,000 Not Implemented
WM0098 # 06 Y:2016 06 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,334 $0 Not Implemented
WM0098 # 07 Y:2016 07 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,178 $0 Not Implemented