Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,616
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0037 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,336 | $0 | Implemented |
UA0037 # 06 Y:2009 | 06 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,571 | $2,500 | Implemented |
UA0037 # 07 Y:2009 | 07 | 2009 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $17,492 | $25,930 | Not Implemented |
UA0037 # 08 Y:2009 | 08 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $58,174 | $32,445 | Implemented |
UA0037 # 09 Y:2009 | 09 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,938 | $6,000 | Implemented |
UA0037 # 10 Y:2009 | 10 | 2009 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $836 | $0 | Implemented |
UA0037 # 11 Y:2009 | 11 | 2009 | USE RADIANT HEATER FOR SPOT HEATING | $7,231 | $16,448 | Not Implemented |
UA0037 # 12 Y:2009 | 12 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $16,135 | $1,700 | Implemented |
UA0036 # 08 Y:2009 | 08 | 2009 | USE PHOTOCELL CONTROLS | $453 | $1,337 | Not Implemented |
UA0036 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,392 | $0 | Implemented |
UA0036 # 02 Y:2009 | 02 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $3,429 | $1,700 | Implemented |
UA0036 # 03 Y:2009 | 03 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $15,005 | $15,600 | Not Implemented |
UA0036 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,387 | $40,768 | Implemented |
UA0036 # 05 Y:2009 | 05 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,452 | $10,320 | Not Implemented |
UA0036 # 06 Y:2009 | 06 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $912 | $1,500 | Implemented |
UA0036 # 07 Y:2009 | 07 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,637 | $17,500 | Not Implemented |
UA0035 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,780 | $1,500 | Implemented |
UA0035 # 02 Y:2009 | 02 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,120 | $0 | Not Implemented |
UA0035 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,800 | $2,900 | Not Implemented |
UA0035 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,882 | $87,077 | Implemented |
UA0035 # 05 Y:2009 | 05 | 2009 | USE PHOTOCELL CONTROLS | $1,846 | $1,782 | Not Implemented |
UA0035 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $899 | $5,448 | Implemented |
UA0035 # 07 Y:2009 | 07 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,983 | $2,478 | Implemented |
UA0035 # 08 Y:2009 | 08 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $129,337 | $0 | Implemented |
UA0035 # 09 Y:2009 | 09 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $3,810 | $2,210 | Implemented |