IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,317

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0184 # 05 Y:2000 05 2000 PAY BILLS ON TIME TO AVOID LATE FEES $40,958 $200 Implemented
WV0184 # 06 Y:2000 06 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $4,706 $870 Not Implemented
WV0184 # 07 Y:2000 07 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,710 $11,000 Implemented
WV0184 # 08 Y:2000 08 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $257,040 $105,000 Not Implemented
WV0183 # 01 Y:2000 01 2000 REDUCE EXCESS STEAM BLEEDING $9,583 $50,000 Not Implemented
WV0183 # 02 Y:2000 02 2000 REPAIR OR REPLACE STEAM TRAPS $50,000 $13,000 Implemented
WV0183 # 03 Y:2000 03 2000 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,279 $2,450 Not Implemented
WV0183 # 04 Y:2000 04 2000 INSTALL SKYLIGHTS $1,074 $3,450 Not Implemented
WV0183 # 05 Y:2000 05 2000 REPAIR AND ELIMINATE STEAM LEAKS $13,112 $550 Implemented
WV0183 # 06 Y:2000 06 2000 DIRECT WARMEST AIR TO COMBUSTION INTAKE $14,087 $10,840 Not Implemented
WV0183 # 07 Y:2000 07 2000 DIRECT WARMEST AIR TO COMBUSTION INTAKE $34,536 $10,840 Not Implemented
WV0183 # 08 Y:2000 08 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $355 $528 Implemented
WV0183 # 09 Y:2000 09 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $336 $100 Not Implemented
WV0183 # 10 Y:2000 10 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,683 $1,000 Implemented
WV0183 # 11 Y:2000 11 2000 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM $53,063 $100,000 Not Implemented
WV0183 # 12 Y:2000 12 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $17,828 $10,000 Not Implemented
WV0183 # 13 Y:2000 13 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,587 $3,000 Not Implemented
WV0183 # 14 Y:2000 14 2000 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $11,984 $1,500 Not Implemented
WV0182 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,539 $60 Implemented
WV0182 # 02 Y:2000 02 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,677 $175 Implemented
WV0182 # 03 Y:2000 03 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,450 $1,870 Not Implemented
WV0182 # 04 Y:2000 04 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,200 $70 Implemented
WV0182 # 05 Y:2000 05 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $1,009 $1,458 Implemented
WV0182 # 06 Y:2000 06 2000 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $35,688 $6,000 Not Implemented
WV0182 # 07 Y:2000 07 2000 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $7,785 $12,000 Not Implemented