Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,317
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0184 # 05 Y:2000 | 05 | 2000 | PAY BILLS ON TIME TO AVOID LATE FEES | $40,958 | $200 | Implemented |
WV0184 # 06 Y:2000 | 06 | 2000 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $4,706 | $870 | Not Implemented |
WV0184 # 07 Y:2000 | 07 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,710 | $11,000 | Implemented |
WV0184 # 08 Y:2000 | 08 | 2000 | INSTALL EQUIPMENT TO MOVE PRODUCT | $257,040 | $105,000 | Not Implemented |
WV0183 # 01 Y:2000 | 01 | 2000 | REDUCE EXCESS STEAM BLEEDING | $9,583 | $50,000 | Not Implemented |
WV0183 # 02 Y:2000 | 02 | 2000 | REPAIR OR REPLACE STEAM TRAPS | $50,000 | $13,000 | Implemented |
WV0183 # 03 Y:2000 | 03 | 2000 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,279 | $2,450 | Not Implemented |
WV0183 # 04 Y:2000 | 04 | 2000 | INSTALL SKYLIGHTS | $1,074 | $3,450 | Not Implemented |
WV0183 # 05 Y:2000 | 05 | 2000 | REPAIR AND ELIMINATE STEAM LEAKS | $13,112 | $550 | Implemented |
WV0183 # 06 Y:2000 | 06 | 2000 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $14,087 | $10,840 | Not Implemented |
WV0183 # 07 Y:2000 | 07 | 2000 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $34,536 | $10,840 | Not Implemented |
WV0183 # 08 Y:2000 | 08 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $355 | $528 | Implemented |
WV0183 # 09 Y:2000 | 09 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $336 | $100 | Not Implemented |
WV0183 # 10 Y:2000 | 10 | 2000 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $18,683 | $1,000 | Implemented |
WV0183 # 11 Y:2000 | 11 | 2000 | INSTALL WASTE HEAT BOILER TO PRODUCE STEAM | $53,063 | $100,000 | Not Implemented |
WV0183 # 12 Y:2000 | 12 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $17,828 | $10,000 | Not Implemented |
WV0183 # 13 Y:2000 | 13 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,587 | $3,000 | Not Implemented |
WV0183 # 14 Y:2000 | 14 | 2000 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $11,984 | $1,500 | Not Implemented |
WV0182 # 01 Y:2000 | 01 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,539 | $60 | Implemented |
WV0182 # 02 Y:2000 | 02 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,677 | $175 | Implemented |
WV0182 # 03 Y:2000 | 03 | 2000 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $5,450 | $1,870 | Not Implemented |
WV0182 # 04 Y:2000 | 04 | 2000 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,200 | $70 | Implemented |
WV0182 # 05 Y:2000 | 05 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,009 | $1,458 | Implemented |
WV0182 # 06 Y:2000 | 06 | 2000 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $35,688 | $6,000 | Not Implemented |
WV0182 # 07 Y:2000 | 07 | 2000 | USE COLD WASTE WATER TO COOL CHILLER FEED WATER | $7,785 | $12,000 | Not Implemented |