IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0345 # 03 Y:1995 03 1995 OPTIMIZE PLANT POWER FACTOR $2,255 $4,500 Not Implemented
MA0345 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,702 $1,200 Implemented
MA0345 # 05 Y:1995 05 1995 USE SYNTHETIC LUBRICANT $941 $300 Implemented
MA0345 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $549 $0 Implemented
MA0345 # 07 Y:1995 07 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $496 $165 Implemented
MA0345 # 08 Y:1995 08 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $404 $500 Not Implemented
MA0345 # 09 Y:1995 09 1995 TREAT AND REUSE RINSE WATERS $3,961 $20,000 Not Implemented
MA0345 # 10 Y:1995 10 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $950 $2,700 Implemented
OR0243 # 01 Y:1995 01 1995 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $20,308 $0 Implemented
OR0243 # 02 Y:1995 02 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,093 $500 Implemented
OR0243 # 03 Y:1995 03 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $627 $198 Not Implemented
OR0243 # 04 Y:1995 04 1995 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,714 $2,108 Not Implemented
OR0243 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $278 $796 Implemented
UM0036 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,067 $5,500 Implemented
UM0036 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,841 $3,216 Implemented
UM0036 # 03 Y:1995 03 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,936 $250 Implemented
UM0036 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,177 $300 Implemented
UM0036 # 05 Y:1995 05 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,147 $5,600 Implemented
SF0068 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,248 $20,160 Implemented
SF0068 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $2,174 $3,300 Implemented
SF0068 # 03 Y:1995 03 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $12,233 $1,000 Implemented
SF0068 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,062 $2,666 Implemented
SF0068 # 05 Y:1995 05 1995 USE SYNTHETIC LUBRICANT $847 $2,867 Implemented
SF0068 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,141 $1,587 Implemented
SF0068 # 07 Y:1995 07 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,680 $62,972 Implemented