IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0257 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,325 $348 Implemented
MS0257 # 06 Y:2004 06 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $6,318 $2,673 Implemented
MS0257 # 07 Y:2004 07 2004 USE OPTIMUM THICKNESS INSULATION $3,906 $1,356 Not Implemented
MS0257 # 08 Y:2004 08 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,163 $742 Not Implemented
MS0257 # 09 Y:2004 09 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,231 $255 Not Implemented
MS0257 # 10 Y:2004 10 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $632 $1,029 Implemented
MS0257 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $535 $969 Not Implemented
LM0083 # 01 Y:2004 01 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $28,411 $5,040 Not Implemented
LM0083 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $836 $0 Implemented
LM0083 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $110 $150 Implemented
LM0083 # 04 Y:2004 04 2004 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $21,186 $3,081 Not Implemented
LM0083 # 05 Y:2004 05 2004 UTILIZE OUTSIDE CONTRACTING $4,988 $500 Not Implemented
LM0083 # 06 Y:2004 06 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,561 $8,800 Not Implemented
NC0287 # 01 Y:2004 01 2004 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $10,282 $9,879 Not Implemented
NC0287 # 02 Y:2004 02 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,536 $1,096 Not Implemented
NC0287 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $615 $100 Implemented
NC0287 # 04 Y:2004 04 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,732 $700 Implemented
NC0287 # 05 Y:2004 05 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,915 $750 Implemented
NC0287 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $803 $1,570 Not Implemented
NC0290 # 01 Y:2004 01 2004 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $145,703 $276,000 Implemented
NC0290 # 02 Y:2004 02 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $9,371 $4,079 Not Implemented
NC0290 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $8,085 $5,500 Not Implemented
NC0290 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $2,865 $9,174 Not Implemented
NC0290 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,206 $2,269 Not Implemented
NC0290 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $612 $100 Implemented