IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0430 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,154 $29,153 Implemented
OR0610 # 01 Y:2013 01 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $11,054 $11,584 Not Implemented
OR0610 # 02 Y:2013 02 2013 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $8,287 $11,998 Not Implemented
OR0610 # 03 Y:2013 03 2013 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $161,127 $238,200 Not Implemented
OR0610 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,406 $2,100 Not Implemented
OR0610 # 05 Y:2013 05 2013 MODERATE COOLING TOWER OUTLET TEMPERATURE $64,511 $85,275 Implemented
OR0610 # 06 Y:2013 06 2013 UPGRADE CONTROLS ON COMPRESSORS $8,077 $26,477 Not Implemented
OR0610 # 07 Y:2013 07 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $6,621 $24,248 Not Implemented
OR0610 # 08 Y:2013 08 2013 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $4,383 $16,215 Not Implemented
OR0610 # 09 Y:2013 09 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,145 $5,840 Not Implemented
UD0886 # 01 Y:2013 01 2013 MINIMIZE WATER USAGE $32,244 $1,000 Not Implemented
UD0886 # 02 Y:2013 02 2013 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,317 $1,000 Not Implemented
UD0886 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,238 $7,500 Not Implemented
UD0886 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,782 $50,000 Not Implemented
UD0886 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,028 $0 Not Implemented
UD0886 # 06 Y:2013 06 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,761 $0 Not Implemented
UD0886 # 07 Y:2013 07 2013 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $36,728 $14,900 Implemented
UD0886 # 08 Y:2013 08 2013 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $4,035 $3,550 Not Implemented
UD0886 # 09 Y:2013 09 2013 UPGRADE CONTROLS ON COMPRESSORS $16,109 $27,000 Not Implemented
UD0886 # 10 Y:2013 10 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $575 $1,000 Not Implemented
UD0886 # 11 Y:2013 11 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $341 $0 Implemented
UD0886 # 12 Y:2013 12 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,648 $6,720 Implemented
UD0886 # 13 Y:2013 13 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,167 $0 Not Implemented
UD0886 # 14 Y:2013 14 2013 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $2,995 $0 Implemented
UD0886 # 15 Y:2013 15 2013 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $9,716 $30,000 Not Implemented