IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0135 # 11 Y:2019 11 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,463 $880 Not Implemented
WM0135 # 12 Y:2019 12 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,255 $1,513 Not Implemented
WM0135 # 13 Y:2019 13 2019 USE PHOTOCELL CONTROLS $1,013 $290 Not Implemented
WM0135 # 14 Y:2019 14 2019 INSTALL OCCUPANCY SENSORS $970 $800 Not Implemented
MA0806 # 01 Y:2019 01 2019 USE SOLAR HEAT FOR HEAT $131,256 $566,995 Implemented
MA0806 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $22,287 $750 Implemented
MA0806 # 03 Y:2019 03 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,496 $71,032 Not Implemented
MA0806 # 04 Y:2019 04 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,289 $15,750 Implemented
MZ0276 # 01 Y:2019 01 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $155 $60 Implemented
MZ0276 # 02 Y:2019 02 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $249 $1,040 Implemented
MZ0276 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,641 $180 Implemented
MZ0276 # 04 Y:2019 04 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $44,070 $184,040 Implemented
MZ0276 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $367 $120 Implemented
MZ0276 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $191 $390 Implemented
OR0721 # 01 Y:2019 01 2019 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $40,539 $84,752 Not Implemented
OR0721 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,383 $7,807 Not Implemented
OR0721 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,615 $5,884 Not Implemented
OR0721 # 04 Y:2019 04 2019 REDUCE HEAT GAIN BY WINDOW TINTING $1,700 $12,122 Not Implemented
AS0474 # 01 Y:2019 01 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $20,118 $5,404 Implemented
AS0474 # 02 Y:2019 02 2019 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $9,875 $2,238 Implemented
AS0474 # 03 Y:2019 03 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,733 $750 Implemented
AS0474 # 04 Y:2019 04 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,818 $895 Implemented
AS0474 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,935 $516 Implemented
AS0474 # 06 Y:2019 06 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,267 $110 Not Implemented
AS0474 # 07 Y:2019 07 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $838 $687 Not Implemented