IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,295

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0238 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,488 $5,859 Implemented
UA0238 # 03 Y:2021 03 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,093 $16,210 Implemented
TT0251 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $95,933 $4,500 Not Implemented
TT0251 # 02 Y:2021 02 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $56,927 $200 Not Implemented
TT0251 # 03 Y:2021 03 2021 ADOPT IN-HOUSE MATERIAL GENERATION $42,490 $112,956 Not Implemented
TT0251 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,814 $2,000 Not Implemented
TT0251 # 05 Y:2021 05 2021 UPGRADE CONTROLS ON COMPRESSORS $9,683 $250 Not Implemented
TT0251 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,965 $15,800 Not Implemented
TT0251 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,136 $35,365 Not Implemented
TT0251 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,374 $15,800 Not Implemented
TT0251 # 09 Y:2021 09 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,884 $40 Not Implemented
TT0251 # 10 Y:2021 10 2021 INSULATE BARE EQUIPMENT $2,602 $297 Not Implemented
TT0251 # 11 Y:2021 11 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,308 $150 Not Implemented
OK1044 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,137 $0 Not Implemented
OK1044 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,516 $3,266 Not Implemented
OK1044 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,702 $14,800 Implemented
OK1044 # 04 Y:2021 04 2021 OPTIMIZE PLANT POWER FACTOR $3,229 $11,200 Not Implemented
UU0182 # 01 Y:2021 01 2021 SELL COMBUSTIBLE WASTE $358,314 $840,585 Implemented
UU0182 # 02 Y:2021 02 2021 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $301,212 $427,040 Implemented
UU0182 # 03 Y:2021 03 2021 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $94,872 $621,000 Not Implemented
UU0182 # 04 Y:2021 04 2021 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $69,301 $172,000 Not Implemented
UU0182 # 05 Y:2021 05 2021 INSULATE BARE EQUIPMENT $5,611 $2,229 Not Implemented
UU0182 # 06 Y:2021 06 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,360 $920 Implemented
AM0821 # 01 Y:2021 01 2021 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $17,688 $5,000 Not Implemented
AM0821 # 02 Y:2021 02 2021 PAY UTILITY BILLS ON TIME $3,204 $0 Not Implemented