Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,091
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0437 # 04 Y:1991 | 04 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,579 | $0 | Implemented |
GT0437 # 05 Y:1991 | 05 | 1991 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,861 | $0 | Implemented |
GT0437 # 06 Y:1991 | 06 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,310 | $0 | Implemented |
GT0437 # 07 Y:1991 | 07 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,478 | $1,000 | Implemented |
GT0438 # 01 Y:1991 | 01 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,380 | $0 | Not Implemented |
GT0438 # 02 Y:1991 | 02 | 1991 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $902 | $0 | Not Implemented |
GT0438 # 03 Y:1991 | 03 | 1991 | INCREASE AMOUNT OF CONDENSATE RETURNED | $10,480 | $3,670 | Not Implemented |
GT0438 # 04 Y:1991 | 04 | 1991 | REPAIR AND ELIMINATE STEAM LEAKS | $2,450 | $425 | Not Implemented |
GT0438 # 05 Y:1991 | 05 | 1991 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $1,030 | $4,500 | Not Implemented |
GT0438 # 06 Y:1991 | 06 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,350 | $2,570 | Not Implemented |
GT0438 # 07 Y:1991 | 07 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,535 | $0 | Not Implemented |
IA0001 # 01 Y:1991 | 01 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $2,263 | $900 | Implemented |
IA0001 # 02 Y:1991 | 02 | 1991 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $464 | $448 | Implemented |
IA0001 # 03 Y:1991 | 03 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $248 | $0 | Implemented |
IA0001 # 04 Y:1991 | 04 | 1991 | REDUCE VENTILATION AIR | $507 | $700 | Implemented |
IA0001 # 05 Y:1991 | 05 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $382 | $686 | Implemented |
IA0001 # 06 Y:1991 | 06 | 1991 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $182 | $90 | Implemented |
IA0001 # 07 Y:1991 | 07 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $95 | $20 | Implemented |
IA0001 # 08 Y:1991 | 08 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $112 | $20 | Implemented |
IA0001 # 09 Y:1991 | 09 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $192 | $20 | Implemented |
IA0002 # 02 Y:1991 | 02 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,080 | $100 | Implemented |
IA0002 # 03 Y:1991 | 03 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $545 | $2,336 | Implemented |
IA0002 # 04 Y:1991 | 04 | 1991 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,727 | $100 | Implemented |
IA0002 # 05 Y:1991 | 05 | 1991 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $527 | $0 | Implemented |
IA0002 # 06 Y:1991 | 06 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $446 | $300 | Implemented |