IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0208 # 04 Y:1998 04 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,843 $2,700 Implemented
SD0208 # 05 Y:1998 05 1998 RECYCLE WHITE WATER $12,375 $5,000 Implemented
SD0208 # 06 Y:1998 06 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $353,400 $310,000 Not Implemented
OR0323 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,329 $15,000 Implemented
OR0323 # 02 Y:1998 02 1998 UPGRADE CONTROLS ON COMPRESSORS $33,509 $5,600 Implemented
OR0323 # 03 Y:1998 03 1998 RECOVER AND REUSE WASTE MATERIAL $16,330 $15,000 Implemented
OR0323 # 04 Y:1998 04 1998 ADD AREA LIGHTING SWITCHES $3,712 $2,800 Not Implemented
OR0323 # 05 Y:1998 05 1998 OPTIMIZE PLANT POWER FACTOR $0 $57,200 Not Implemented
OR0323 # 06 Y:1998 06 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $48,539 $3,154 Not Implemented
OR0323 # 07 Y:1998 07 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $89,264 $5,400 Implemented
OR0323 # 08 Y:1998 08 1998 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,267 $5,409 Implemented
OR0323 # 09 Y:1998 09 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $4,032 $980 Implemented
OR0323 # 10 Y:1998 10 1998 MOVE PRODUCT USING MECHANICAL MEANS $27,522 $71,000 Implemented
ND0305 # 01 Y:1998 01 1998 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,973 $22,500 Not Implemented
ND0305 # 02 Y:1998 02 1998 OPTIMIZE PLANT POWER FACTOR $19,450 $11,886 Not Implemented
ND0305 # 03 Y:1998 03 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $40,120 $85,000 Implemented
ND0305 # 04 Y:1998 04 1998 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $13,776 $4,000 Not Implemented
ND0305 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,160 $49,023 Not Implemented
ND0305 # 06 Y:1998 06 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,626 $9,836 Not Implemented
ND0305 # 07 Y:1998 07 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,306 $3,240 Not Implemented
ND0305 # 08 Y:1998 08 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,722 $10,000 Not Implemented
ND0305 # 09 Y:1998 09 1998 OPTIMIZE PLANT POWER FACTOR $5,272 $1,250 Not Implemented
ND0305 # 10 Y:1998 10 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,611 $15,801 Not Implemented
ND0305 # 11 Y:1998 11 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,422 $340 Implemented
ND0305 # 12 Y:1998 12 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,101 $5,400 Not Implemented