IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0061 # 03 Y:2003 03 2003 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,000 $300 Implemented
TA0061 # 04 Y:2003 04 2003 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,870 $435 Implemented
TA0061 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,100 $1,730 Not Implemented
TA0061 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $0 Implemented
TA0061 # 07 Y:2003 07 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $400 $0 Not Implemented
TA0061 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $350 $170 Not Implemented
TA0061 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $300 $283 Implemented
TA0061 # 10 Y:2003 10 2003 DISCONNECT BALLASTS $140 $270 Not Implemented
TA0061 # 11 Y:2003 11 2003 INSULATE BARE EQUIPMENT $140 $255 Not Implemented
TA0061 # 12 Y:2003 12 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $100 $0 Not Implemented
SD0329 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,850 $15,600 Not Implemented
SD0329 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,418 $380 Implemented
SD0329 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,587 $320 Not Implemented
SD0329 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,811 $6,912 Not Implemented
SD0329 # 05 Y:2003 05 2003 USE PHOTOCELL CONTROLS $1,360 $1,000 Not Implemented
UD0676 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $19,216 $6,000 Implemented
UD0676 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,997 $5,000 Not Implemented
UD0676 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,900 $0 Not Implemented
UD0676 # 04 Y:2003 04 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,015 $25,000 Implemented
UD0676 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $8,147 $2,000 Implemented
UD0676 # 06 Y:2003 06 2003 DISCONNECT BALLASTS $2,363 $225 Not Implemented
UD0676 # 07 Y:2003 07 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,739 $500 Not Implemented
UD0676 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,230 $200 Implemented
OK0667 # 01 Y:2003 01 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,098 $4,390 Not Implemented
OK0667 # 02 Y:2003 02 2003 RECOVER AND REUSE WASTE MATERIAL $1,957 $564 Not Implemented