Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0061 # 03 Y:2003 | 03 | 2003 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,000 | $300 | Implemented |
TA0061 # 04 Y:2003 | 04 | 2003 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,870 | $435 | Implemented |
TA0061 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $1,100 | $1,730 | Not Implemented |
TA0061 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $690 | $0 | Implemented |
TA0061 # 07 Y:2003 | 07 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $400 | $0 | Not Implemented |
TA0061 # 08 Y:2003 | 08 | 2003 | INSTALL OCCUPANCY SENSORS | $350 | $170 | Not Implemented |
TA0061 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $300 | $283 | Implemented |
TA0061 # 10 Y:2003 | 10 | 2003 | DISCONNECT BALLASTS | $140 | $270 | Not Implemented |
TA0061 # 11 Y:2003 | 11 | 2003 | INSULATE BARE EQUIPMENT | $140 | $255 | Not Implemented |
TA0061 # 12 Y:2003 | 12 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $100 | $0 | Not Implemented |
SD0329 # 01 Y:2003 | 01 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,850 | $15,600 | Not Implemented |
SD0329 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,418 | $380 | Implemented |
SD0329 # 03 Y:2003 | 03 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,587 | $320 | Not Implemented |
SD0329 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,811 | $6,912 | Not Implemented |
SD0329 # 05 Y:2003 | 05 | 2003 | USE PHOTOCELL CONTROLS | $1,360 | $1,000 | Not Implemented |
UD0676 # 01 Y:2003 | 01 | 2003 | OPTIMIZE PLANT POWER FACTOR | $19,216 | $6,000 | Implemented |
UD0676 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,997 | $5,000 | Not Implemented |
UD0676 # 03 Y:2003 | 03 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,900 | $0 | Not Implemented |
UD0676 # 04 Y:2003 | 04 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,015 | $25,000 | Implemented |
UD0676 # 05 Y:2003 | 05 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,147 | $2,000 | Implemented |
UD0676 # 06 Y:2003 | 06 | 2003 | DISCONNECT BALLASTS | $2,363 | $225 | Not Implemented |
UD0676 # 07 Y:2003 | 07 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,739 | $500 | Not Implemented |
UD0676 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,230 | $200 | Implemented |
OK0667 # 01 Y:2003 | 01 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,098 | $4,390 | Not Implemented |
OK0667 # 02 Y:2003 | 02 | 2003 | RECOVER AND REUSE WASTE MATERIAL | $1,957 | $564 | Not Implemented |