Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,666
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0037 # 01 Y:2009 | 01 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $105,200 | $0 | Implemented |
DL0037 # 02 Y:2009 | 02 | 2009 | INSTALL OCCUPANCY SENSORS | $644 | $140 | Implemented |
DL0037 # 03 Y:2009 | 03 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,050 | $5,000 | Not Implemented |
DL0037 # 04 Y:2009 | 04 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,500 | $880 | Not Implemented |
DL0037 # 05 Y:2009 | 05 | 2009 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,330 | $8,800 | Not Implemented |
DL0037 # 06 Y:2009 | 06 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,254 | $35,000 | Not Implemented |
SD0415 # 01 Y:2009 | 01 | 2009 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,503 | $18,750 | Implemented |
SD0415 # 02 Y:2009 | 02 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,780 | $7,974 | Not Implemented |
SD0415 # 03 Y:2009 | 03 | 2009 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,009 | $0 | Implemented |
SD0415 # 04 Y:2009 | 04 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,047 | $0 | Not Implemented |
SD0415 # 05 Y:2009 | 05 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,035 | $128 | Implemented |
SD0415 # 06 Y:2009 | 06 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $910 | $1,000 | Implemented |
SD0415 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $657 | $5,864 | Not Implemented |
SD0415 # 08 Y:2009 | 08 | 2009 | INSTALL SKYLIGHTS | $323 | $1,470 | Not Implemented |
SD0415 # 09 Y:2009 | 09 | 2009 | INSTALL OCCUPANCY SENSORS | $154 | $347 | Implemented |
SF0374 # 01 Y:2009 | 01 | 2009 | REPAIR AND ELIMINATE STEAM LEAKS | $45,410 | $0 | Implemented |
SF0374 # 02 Y:2009 | 02 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,699 | $0 | Implemented |
SF0374 # 03 Y:2009 | 03 | 2009 | REDUCE EXCESSIVE BOILER BLOWDOWN | $10,627 | $2,372 | Implemented |
SF0374 # 04 Y:2009 | 04 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,963 | $2,837 | Implemented |
SF0374 # 05 Y:2009 | 05 | 2009 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $5,402 | $3,037 | Implemented |
SF0374 # 06 Y:2009 | 06 | 2009 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $15,888 | $9,574 | Implemented |
SF0374 # 07 Y:2009 | 07 | 2009 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $17,939 | $12,500 | Implemented |
SF0374 # 08 Y:2009 | 08 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,237 | $33,968 | Implemented |
SF0374 # 09 Y:2009 | 09 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $51,835 | $40,007 | Implemented |
SF0374 # 10 Y:2009 | 10 | 2009 | USE PHOTOCELL CONTROLS | $18,403 | $18,196 | Implemented |