IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0474 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $77 $0 Implemented
UA0211 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,405 $24,659 Not Implemented
UA0211 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $639 $1,455 Not Implemented
UA0211 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,492 $1,345 Not Implemented
UA0211 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,928 $100 Not Implemented
UA0211 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,287 $791 Not Implemented
UA0211 # 06 Y:2019 06 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,787 $16,620 Not Implemented
UA0211 # 07 Y:2019 07 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $374,108 $1,310,277 Implemented
UA0211 # 08 Y:2019 08 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $26,196 $150 Implemented
UA0211 # 09 Y:2019 09 2019 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,027,932 $1,000,000 Not Implemented
UD0998 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,128 $0 Not Implemented
UD0998 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,093 $0 Not Implemented
UD0998 # 03 Y:2019 03 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $10,815 $2,500 Not Implemented
UD0998 # 04 Y:2019 04 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,888 $40 Not Implemented
UD0998 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $965 $280 Not Implemented
UD0998 # 06 Y:2019 06 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,189 $3,500 Not Implemented
UD0998 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,380 $1,315 Not Implemented
UD0998 # 08 Y:2019 08 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,135 $5,000 Not Implemented
UD0998 # 09 Y:2019 09 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,344 $2,520 Not Implemented
OK1012 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $4,858 $0 Implemented
OK1012 # 02 Y:2019 02 2019 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,617 $1,676 Implemented
OK1012 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,564 $12,651 Implemented
OK1012 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,148 $1,560 Implemented
OK1012 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $686 $405 Implemented
OK1012 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $262 $106 Not Implemented