Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,485
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0474 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $77 | $0 | Implemented |
UA0211 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,405 | $24,659 | Not Implemented |
UA0211 # 02 Y:2019 | 02 | 2019 | INSTALL OCCUPANCY SENSORS | $639 | $1,455 | Not Implemented |
UA0211 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,492 | $1,345 | Not Implemented |
UA0211 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,928 | $100 | Not Implemented |
UA0211 # 05 Y:2019 | 05 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,287 | $791 | Not Implemented |
UA0211 # 06 Y:2019 | 06 | 2019 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $9,787 | $16,620 | Not Implemented |
UA0211 # 07 Y:2019 | 07 | 2019 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $374,108 | $1,310,277 | Implemented |
UA0211 # 08 Y:2019 | 08 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $26,196 | $150 | Implemented |
UA0211 # 09 Y:2019 | 09 | 2019 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,027,932 | $1,000,000 | Not Implemented |
UD0998 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,128 | $0 | Not Implemented |
UD0998 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,093 | $0 | Not Implemented |
UD0998 # 03 Y:2019 | 03 | 2019 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $10,815 | $2,500 | Not Implemented |
UD0998 # 04 Y:2019 | 04 | 2019 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,888 | $40 | Not Implemented |
UD0998 # 05 Y:2019 | 05 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $965 | $280 | Not Implemented |
UD0998 # 06 Y:2019 | 06 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,189 | $3,500 | Not Implemented |
UD0998 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,380 | $1,315 | Not Implemented |
UD0998 # 08 Y:2019 | 08 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,135 | $5,000 | Not Implemented |
UD0998 # 09 Y:2019 | 09 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,344 | $2,520 | Not Implemented |
OK1012 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,858 | $0 | Implemented |
OK1012 # 02 Y:2019 | 02 | 2019 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,617 | $1,676 | Implemented |
OK1012 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,564 | $12,651 | Implemented |
OK1012 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,148 | $1,560 | Implemented |
OK1012 # 05 Y:2019 | 05 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $686 | $405 | Implemented |
OK1012 # 06 Y:2019 | 06 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $262 | $106 | Not Implemented |