Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,713
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0502 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,047 | $57 | Not Implemented |
UF0501 # 01 Y:2017 | 01 | 2017 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $1,393,980 | $3,306,000 | Not Implemented |
UF0501 # 02 Y:2017 | 02 | 2017 | OPTIMIZE PLANT POWER FACTOR | $154,176 | $60,284 | Implemented |
UF0501 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $77,438 | $2,184 | Implemented |
UF0501 # 04 Y:2017 | 04 | 2017 | REPAIR AND ELIMINATE STEAM LEAKS | $32,236 | $1,794 | Implemented |
UF0501 # 05 Y:2017 | 05 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $29,058 | $39,050 | Implemented |
UF0501 # 06 Y:2017 | 06 | 2017 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $9,110 | $700 | Implemented |
UF0501 # 07 Y:2017 | 07 | 2017 | USE OPTIMUM THICKNESS INSULATION | $6,596 | $11,216 | Implemented |
UF0501 # 08 Y:2017 | 08 | 2017 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $5,834 | $0 | Implemented |
UF0501 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,020 | $482 | Implemented |
MI0306 # 01 Y:2017 | 01 | 2017 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $53,389 | $312,800 | Not Implemented |
MI0306 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,953 | $33,615 | Not Implemented |
MI0306 # 03 Y:2017 | 03 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,316 | $240 | Implemented |
MI0306 # 04 Y:2017 | 04 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,609 | $8,095 | Not Implemented |
MI0306 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,512 | $14,280 | Not Implemented |
MI0306 # 06 Y:2017 | 06 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,286 | $9,500 | Not Implemented |
MI0306 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,134 | $1,660 | Implemented |
MI0306 # 08 Y:2017 | 08 | 2017 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $3,893 | $8,040 | Not Implemented |
MI0306 # 09 Y:2017 | 09 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,238 | $650 | Implemented |
MI0306 # 10 Y:2017 | 10 | 2017 | INSTALL OCCUPANCY SENSORS | $1,858 | $177 | Implemented |
MI0306 # 11 Y:2017 | 11 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $711 | $120 | Implemented |
MI0306 # 12 Y:2017 | 12 | 2017 | INSTALL OCCUPANCY SENSORS | $612 | $1,630 | Implemented |
MI0305 # 01 Y:2016 | 01 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $21,479 | $10,875 | Not Implemented |
MI0305 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,453 | $13,550 | Not Implemented |
MI0305 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,922 | $1,700 | Implemented |