Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0712 # 08 Y:2005 | 08 | 2005 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $4,000 | $3,000 | Not Implemented |
OK0712 # 09 Y:2005 | 09 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,026 | $3,377 | Not Implemented |
OK0712 # 10 Y:2005 | 10 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $1,512 | $660 | Not Implemented |
OK0712 # 11 Y:2005 | 11 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,871 | $1,327 | Not Implemented |
OK0712 # 12 Y:2005 | 12 | 2005 | PAY BILLS ON TIME TO AVOID LATE FEES | $7,801 | $0 | Not Implemented |
OK0711 # 01 Y:2005 | 01 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,068 | $25,248 | Not Implemented |
OK0711 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $333 | $647 | Not Implemented |
OK0711 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,907 | $3,150 | Not Implemented |
OK0711 # 04 Y:2005 | 04 | 2005 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $13,929 | $125 | Not Implemented |
OK0711 # 05 Y:2005 | 05 | 2005 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $8,800 | $0 | Not Implemented |
OK0711 # 06 Y:2005 | 06 | 2005 | INSTALL OCCUPANCY SENSORS | $846 | $811 | Not Implemented |
OK0711 # 07 Y:2005 | 07 | 2005 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $215,784 | $8,400 | Not Implemented |
OK0711 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $603 | $4,626 | Not Implemented |
OK0710 # 01 Y:2005 | 01 | 2005 | AVOID EMERGENCY REWIND OF MOTORS | $18,566 | $18,454 | Not Implemented |
OK0710 # 02 Y:2005 | 02 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,475 | $3,550 | Implemented |
OK0710 # 03 Y:2005 | 03 | 2005 | INSTALL SET-BACK TIMERS | $1,403 | $430 | Not Implemented |
OK0710 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,823 | $1,607 | Not Implemented |
OK0710 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,439 | $4,746 | Implemented |
OK0710 # 06 Y:2005 | 06 | 2005 | INSTALL OCCUPANCY SENSORS | $467 | $356 | Not Implemented |
OK0710 # 07 Y:2005 | 07 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $729 | $30 | Not Implemented |
OK0710 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $298 | $895 | Not Implemented |
OK0709 # 01 Y:2005 | 01 | 2005 | USE POWER DURING OFF-PEAK PERIODS | $2,560 | $0 | Not Implemented |
OK0709 # 02 Y:2005 | 02 | 2005 | INSULATE BARE EQUIPMENT | $3,684 | $1,030 | Implemented |
OK0709 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,659 | $11,363 | Not Implemented |
OK0709 # 04 Y:2005 | 04 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,493 | $21,700 | Not Implemented |