IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,377

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0160 # 03 Y:1985 03 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,357 $1,400 Implemented
UD0160 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $280 $200 Implemented
UD0160 # 05 Y:1985 05 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,689 $0 Implemented
UD0160 # 06 Y:1985 06 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,825 $551 Implemented
UD0160 # 07 Y:1985 07 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,401 $7,500 Implemented
MA0024 # 01 Y:1985 01 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $735 $378 Implemented
MA0024 # 02 Y:1985 02 1985 OPERATE BOILERS ON HIGH FIRE SETTING $2,731 $6,200 Implemented
MA0024 # 03 Y:1985 03 1985 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $17,848 $12,090 Not Implemented
MA0024 # 04 Y:1985 04 1985 BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED $6,406 $2,900 Implemented
TN0245 # 01 Y:1985 01 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $5,632 $232 Implemented
TN0245 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,837 $0 Implemented
TN0245 # 03 Y:1985 03 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,185 $0 Implemented
TN0245 # 04 Y:1985 04 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,176 $400 Not Implemented
TN0245 # 05 Y:1985 05 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,233 $225 Implemented
TN0245 # 06 Y:1985 06 1985 REPAIR AND ELIMINATE STEAM LEAKS $976 $29 Implemented
TN0245 # 07 Y:1985 07 1985 INSULATE BARE EQUIPMENT $1,130 $214 Not Implemented
TN0246 # 01 Y:1985 01 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $16,970 $3,350 Implemented
TN0246 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,100 $1,200 Implemented
TN0246 # 03 Y:1985 03 1985 INSULATE BARE EQUIPMENT $3,100 $500 Not Implemented
TN0246 # 04 Y:1985 04 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,940 $600 Implemented
TS0021 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $844 $326 Not Implemented
TS0021 # 02 Y:1985 02 1985 INSTALL SET-BACK TIMERS $624 $700 Not Implemented
TS0021 # 03 Y:1985 03 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,093 $4,800 Not Implemented
TS0021 # 04 Y:1985 04 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $633 $300 Not Implemented
TS0021 # 05 Y:1985 05 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $3,178 $150 Not Implemented