Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,998
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0191 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,594 | $2,592 | Implemented |
KU0191 # 02 Y:1986 | 02 | 1986 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,988 | $0 | Not Implemented |
KU0191 # 03 Y:1986 | 03 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $423 | $100 | Implemented |
KU0191 # 04 Y:1986 | 04 | 1986 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $221 | $0 | Implemented |
KU0191 # 05 Y:1986 | 05 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $525 | $0 | Implemented |
KU0191 # 06 Y:1986 | 06 | 1986 | IMPROVE LUBRICATION PRACTICES | $151 | $138 | Not Implemented |
KU0187 # 01 Y:1986 | 01 | 1986 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,097 | $193 | Implemented |
KU0187 # 02 Y:1986 | 02 | 1986 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $1,550 | $2,000 | Implemented |
KU0187 # 03 Y:1986 | 03 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $218 | $0 | Implemented |
KU0187 # 04 Y:1986 | 04 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $684 | $1,200 | Not Implemented |
KU0187 # 05 Y:1986 | 05 | 1986 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $231 | $0 | Implemented |
KU0187 # 06 Y:1986 | 06 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $136 | $0 | Implemented |
KU0188 # 01 Y:1986 | 01 | 1986 | IMPROVE LUBRICATION PRACTICES | $13,554 | $680 | Not Implemented |
KU0188 # 02 Y:1986 | 02 | 1986 | INSTALL SET-BACK TIMERS | $2,849 | $248 | Not Implemented |
KU0188 # 03 Y:1986 | 03 | 1986 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $2,183 | $900 | Implemented |
KU0188 # 04 Y:1986 | 04 | 1986 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $3,400 | $4,600 | Implemented |
KU0188 # 05 Y:1986 | 05 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,097 | $100 | Not Implemented |
KU0188 # 06 Y:1986 | 06 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $255 | $0 | Not Implemented |
KU0189 # 01 Y:1986 | 01 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,480 | $6,000 | Implemented |
KU0189 # 02 Y:1986 | 02 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,071 | $8,000 | Implemented |
KU0189 # 03 Y:1986 | 03 | 1986 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $3,597 | $500 | Not Implemented |
KU0189 # 04 Y:1986 | 04 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,273 | $5,000 | Not Implemented |
KU0189 # 05 Y:1986 | 05 | 1986 | USE MINIMUM STEAM OPERATING PRESSURE | $775 | $0 | Implemented |
KU0189 # 06 Y:1986 | 06 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $485 | $0 | Not Implemented |
KU0189 # 07 Y:1986 | 07 | 1986 | INSULATE BARE EQUIPMENT | $2,648 | $5,000 | Not Implemented |