Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0667 # 03 Y:2003 | 03 | 2003 | INSTALL OCCUPANCY SENSORS | $670 | $760 | Not Implemented |
OK0667 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,471 | $1,855 | Not Implemented |
OK0667 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $931 | $185 | Not Implemented |
OK0667 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $604 | $643 | Not Implemented |
OK0667 # 07 Y:2003 | 07 | 2003 | INSULATE BARE EQUIPMENT | $551 | $2,519 | Not Implemented |
OK0667 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,918 | $367 | Not Implemented |
OK0667 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $652 | $5,401 | Not Implemented |
OK0667 # 10 Y:2003 | 10 | 2003 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $2,803 | $500 | Not Implemented |
OK0667 # 11 Y:2003 | 11 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,265 | $0 | Not Implemented |
GT0764 # 01 Y:2003 | 01 | 2003 | COVER OPEN TANKS | $17,200 | $0 | Implemented |
GT0764 # 02 Y:2003 | 02 | 2003 | USE SYNTHETIC LUBRICANT | $1,055 | $0 | Not Implemented |
GT0764 # 03 Y:2003 | 03 | 2003 | COVER OPEN TANKS | $7,550 | $2,505 | Not Implemented |
GT0764 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $620 | $1,555 | Implemented |
GT0764 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,750 | $710 | Implemented |
GT0764 # 06 Y:2003 | 06 | 2003 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $17,500 | $38,000 | Not Implemented |
GT0764 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,150 | $5,635 | Implemented |
GT0764 # 08 Y:2003 | 08 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,368 | $36,246 | Implemented |
NC0263 # 01 Y:2003 | 01 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $118,487 | $500 | Not Implemented |
NC0263 # 02 Y:2003 | 02 | 2003 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $22,423 | $10,000 | Not Implemented |
NC0263 # 03 Y:2003 | 03 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $33,114 | $24,600 | Not Implemented |
NC0263 # 04 Y:2003 | 04 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $47,210 | $100,000 | Implemented |
NC0263 # 05 Y:2003 | 05 | 2003 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $8,768 | $10,000 | Not Implemented |
NC0263 # 06 Y:2003 | 06 | 2003 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $46,271 | $135,400 | Not Implemented |
NC0263 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $556 | $680 | Implemented |
NC0263 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $413 | $240 | Implemented |