IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0297 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,005 $7,451 Not Implemented
BD0312 # 01 Y:2006 01 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $61,556 $162,010 Not Implemented
BD0312 # 02 Y:2006 02 2006 USE SYNTHETIC LUBRICANT $16,661 $10,500 Not Implemented
BD0312 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,668 $0 Not Implemented
MI0132 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $49 $2,342 Implemented
MI0132 # 02 Y:2006 02 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $889 $0 Implemented
MI0132 # 03 Y:2006 03 2006 INSTALL TIMERS AND/OR THERMOSTATS $222 $1,732 Implemented
MI0132 # 04 Y:2006 04 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8 $23,253 Not Implemented
MI0132 # 05 Y:2006 05 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $697 $20,253 Not Implemented
AM0515 # 01 Y:2006 01 2006 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $1,467,000 $250,000 Not Implemented
AM0515 # 02 Y:2006 02 2006 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $897,000 $3,260,000 Not Implemented
AM0515 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $66,000 $65,000 Implemented
AM0515 # 04 Y:2006 04 2006 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $29,840 $13,000 Not Implemented
AM0515 # 05 Y:2006 05 2006 MINIMIZE WATER USAGE $24,580 $15,000 Not Implemented
AM0515 # 06 Y:2006 06 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,500 $6,700 Implemented
AM0515 # 07 Y:2006 07 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,580 $27,400 Implemented
AM0515 # 08 Y:2006 08 2006 INSTALL TIMERS AND/OR THERMOSTATS $6,900 $80 Implemented
AM0515 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,560 $20,750 Not Implemented
AM0515 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $4,440 $1,580 Implemented
AM0515 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,690 $3,800 Not Implemented
UU0102 # 01 Y:2006 01 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $88,420 $3,500 Implemented
UU0102 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,430 $4,040 Implemented
UU0102 # 03 Y:2006 03 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $540 $620 Not Implemented
UU0102 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $23,250 $8,290 Implemented
UU0102 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,990 $78,390 Not Implemented