IAC logo
IAC Assessment: AM0515
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0515
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2006
Principal Product semiconductor wafers
NAICS 334413 - Semiconductor and Related Device Manufacturing
SIC 3674 - Semiconductors And Related Devices
Sales >$500,000,000
# of Employees 3,000
Plant Area (Sq.Ft.) 1,492,000
Annual Production 306,800 Pieces
Production Hrs. Annual 8,736
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $7,378,000 203,342,000 kWh $0.04
Electricity Demand $3,845,000 315,876 kW-months/year $12.17
Electricity Fees $98,500 - $ -
Natural Gas $3,326,900 420,100 MMBtu $7.92
TOTAL ENERGY COSTS $14,648,400
RECOMMENDED SAVINGS* $2,530,090 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $103,420
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$1,467,000
Cost:
$250,000
- - - - $1,467,000 185,200 - - -
-
kWh
-
-
kW-months/year
$1,467,000
185,200
MMBtu
-
-
$
02: 2.3112 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS Savings:
$897,000
Cost:
$3,260,000
$114,000 - $783,000 65,143 - - - - $114,000
-
kWh
$783,000
65,143
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$66,000
Cost:
$65,000
- - - - $66,000 8,400 - - -
-
kWh
-
-
kW-months/year
$66,000
8,400
MMBtu
-
-
$
04: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$29,840
Cost:
$13,000
- - - - $29,840 3,730 - - -
-
kWh
-
-
kW-months/year
$29,840
3,730
MMBtu
-
-
$
05: 3.4151 MINIMIZE WATER USAGE Savings:
$24,580
Cost:
$15,000
- - - - - - $24,580 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$24,580
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$16,500
Cost:
$6,700
- - - - $16,500 2,088 - - -
-
kWh
-
-
kW-months/year
$16,500
2,088
MMBtu
-
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$9,580
Cost:
$27,400
- - - - $9,580 1,210 - - -
-
kWh
-
-
kW-months/year
$9,580
1,210
MMBtu
-
-
$
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,900
Cost:
$80
- - - - $6,900 871 - - -
-
kWh
-
-
kW-months/year
$6,900
871
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,560
Cost:
$20,750
$5,560 93,600 $1,000 82 - - - - $5,560
93,600
kWh
$1,000
82
kW-months/year
-
-
MMBtu
-
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,440
Cost:
$1,580
$2,770 56,800 $1,670 137 - - - - $2,770
56,800
kWh
$1,670
137
kW-months/year
-
-
MMBtu
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,690
Cost:
$3,800
$280 5,780 $100 8 - - $1,310 - $280
5,780
kWh
$100
8
kW-months/year
-
-
MMBtu
$1,310
-
$
TOTAL RECOMMENDED Savings:
$2,530,090
Cost:
$3,663,310
$122,610 156,180 $785,770 65,370 $1,595,820 201,499 $25,890 - $122,610
156,180
kWh
$785,770
65,370
kW-months/year
$1,595,820
201,499
MMBtu
$25,890
-
$
TOTAL IMPLEMENTED Savings:
$103,420
Cost:
$100,760
$2,770 56,800 $1,670 137 $98,980 12,569 - - $2,770
56,800
kWh
$1,670
137
kW-months/year
$98,980
12,569
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost