IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0779 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,745 $19,917 Not Implemented
MA0779 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $3,249 $100 Implemented
MA0779 # 05 Y:2017 05 2017 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,890 $7,225 Not Implemented
MA0779 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $213 $200 Implemented
AS0441 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $174,581 $25,494 Not Implemented
AS0441 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,783 $37,000 Implemented
AS0441 # 03 Y:2017 03 2017 USE SOLAR HEAT TO HEAT WATER $1,380 $1,005 Not Implemented
OK0970 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,359 $5,459 Not Implemented
OK0970 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,255 $4,676 Not Implemented
OK0970 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,299 $1,252 Not Implemented
OK0970 # 04 Y:2017 04 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,913 $1,909 Not Implemented
OK0970 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,763 $27,600 Not Implemented
OK0970 # 06 Y:2017 06 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,582 $9,158 Not Implemented
OK0970 # 07 Y:2017 07 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $11,037 $9,470 Not Implemented
OK0970 # 08 Y:2017 08 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,475 $7,530 Not Implemented
OK0970 # 09 Y:2017 09 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $30,101 $110,025 Not Implemented
OK0970 # 10 Y:2017 10 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,002 $9,779 Not Implemented
GT0901 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $89,452 $5,000 Implemented
GT0901 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,992 $10,805 Implemented
GT0901 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $1,259 $2,654 Not Implemented
GT0901 # 04 Y:2017 04 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $8,249 $18,040 Not Implemented
GT0901 # 05 Y:2017 05 2017 USE SOLAR HEAT FOR HEAT $52,084 $187,502 Not Implemented
MA0778 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $93,550 $132,200 Not Implemented
MA0778 # 02 Y:2017 02 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $17,208 $14,500 Implemented
MA0778 # 03 Y:2017 03 2017 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $17,175 $73,000 Implemented