IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,642

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0038 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $600 $178 Implemented
MZ0038 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $840 $850 Implemented
MZ0038 # 05 Y:2009 05 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,110 $4,200 Not Implemented
MZ0039 # 01 Y:2009 01 2009 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $48,883 $510,446 Implemented
MZ0039 # 02 Y:2009 02 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,294 $8,400 Implemented
MZ0039 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $840 $850 Implemented
MZ0039 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,863 $0 Implemented
MZ0039 # 05 Y:2009 05 2009 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $15,679 $18,600 Implemented
MZ0036 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,757 $26,855 Implemented
MZ0036 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $22,645 $1,500 Not Implemented
MZ0036 # 03 Y:2009 03 2009 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $2,267 $5,320 Not Implemented
MZ0036 # 04 Y:2009 04 2009 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $4,395 $8,757 Implemented
MZ0036 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $62,000 $850 Implemented
MZ0037 # 01 Y:2009 01 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $87,552 $18,000 Not Implemented
MZ0037 # 02 Y:2009 02 2009 USE OPTIMUM THICKNESS INSULATION $1,717 $4,200 Not Implemented
MZ0037 # 03 Y:2009 03 2009 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $11,665 $2,900 Not Implemented
MZ0037 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $739 $850 Not Implemented
MZ0037 # 05 Y:2009 05 2009 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $710 $1,993 Not Implemented
MZ0037 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,988 $59,705 Not Implemented
MZ0037 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $490 $640 Not Implemented
MZ0034 # 01 Y:2009 01 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $14,217 $1,000 Implemented
MZ0034 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $625 $650 Implemented
MZ0034 # 03 Y:2009 03 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,996 $0 Implemented
MZ0034 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,188 $32,000 Implemented
MZ0034 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $5,200 $532 Implemented