IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,731

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0208 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,770 $33,570 Implemented
DL0208 # 10 Y:2022 10 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,982 $55,000 Implemented
DL0208 # 11 Y:2022 11 2022 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,359 $7,840 Not Implemented
DL0208 # 12 Y:2022 12 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $436 $2,500 Implemented
IC0264 # 01 Y:2022 01 2022 RECOVER WASTE HEAT FROM EQUIPMENT $5,084 $2,113 Not Implemented
IC0264 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,944 $4,150 Implemented
IC0264 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,361 $10,377 Implemented
IC0264 # 04 Y:2022 04 2022 UPGRADE CONTROLS ON COMPRESSORS $2,600 $15,017 Not Implemented
IC0264 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $3,552 $15,893 Not Implemented
IC0264 # 06 Y:2022 06 2022 REDUCE VENTILATION AIR $1,650 $6,000 Implemented
IP0160 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,174 $0 Implemented
IP0160 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,950 $10 Implemented
IP0160 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,154 $1,596 Implemented
IP0160 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,349 $1,448 Not Implemented
IP0160 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,544 $1,747 Not Implemented
MA0842 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $50,962 $247,937 Not Implemented
MA0842 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,685 $11,100 Implemented
MA0842 # 03 Y:2022 03 2022 USE HEAT PUMP FOR SPACE CONDITIONING $5,243 $7,450 Implemented
MA0842 # 04 Y:2022 04 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,289 $900 Not Implemented
MA0842 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,119 $11,630 Implemented
MU0011 # 01 Y:2022 01 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $361 $0 Implemented
MU0011 # 02 Y:2022 02 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $32,543 $74 Not Implemented
MU0011 # 03 Y:2022 03 2022 REPAIR AND ELIMINATE STEAM LEAKS $13,523 $284 Implemented
MU0011 # 04 Y:2022 04 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $320 $200 Implemented
MZ0306 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,617 $50,190 Not Implemented