IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0264 # 01 Y:2022 01 2022 RECOVER WASTE HEAT FROM EQUIPMENT $5,084 $2,113 Not Implemented
IC0264 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,944 $4,150 Implemented
IC0264 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,361 $10,377 Implemented
IC0264 # 04 Y:2022 04 2022 UPGRADE CONTROLS ON COMPRESSORS $2,600 $15,017 Not Implemented
IC0264 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $3,552 $15,893 Not Implemented
IC0264 # 06 Y:2022 06 2022 REDUCE VENTILATION AIR $1,650 $6,000 Implemented
IP0160 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,174 $0 Implemented
IP0160 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,950 $10 Implemented
IP0160 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,154 $1,596 Implemented
IP0160 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,349 $1,448 Not Implemented
IP0160 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,544 $1,747 Not Implemented
MZ0306 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,617 $50,190 Not Implemented
MZ0306 # 02 Y:2022 02 2022 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $4,781 $18,650 Not Implemented
MZ0306 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $35,350 $30,500 Not Implemented
MZ0306 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $247 $870 Implemented
MZ0306 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,459 $17,421 Not Implemented
MZ0306 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $640 $160 Not Implemented
MZ0306 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,283 $9,100 Not Implemented
IC0263 # 01 Y:2022 01 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $32,000 $174,422 Implemented
IC0263 # 02 Y:2022 02 2022 REPLACE BOILER $4,029 $54,022 Implemented
IC0263 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,790 $4,197 Not Implemented
IC0263 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $166 $280 Implemented
MS0400 # 01 Y:2022 01 2022 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,137 $0 Not Implemented
MS0400 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $421 $2,011 Not Implemented
MS0400 # 03 Y:2022 03 2022 REDUCE HEAT GAIN BY WINDOW TINTING $4,268 $39,618 Not Implemented