IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0043 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $575 $302 Not Implemented
GT0562 # 01 Y:1995 01 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $82,460 $0 Implemented
GT0562 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $67,980 $0 Implemented
WI0244 # 01 Y:1995 01 1995 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $29,259 $120,000 n/a
WI0244 # 02 Y:1995 02 1995 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $12,574 $6,250 n/a
WI0244 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,927 $270 n/a
WI0244 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $2,299 $1,000 n/a
WI0244 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $750 $640 n/a
WI0244 # 06 Y:1995 06 1995 COVER OPEN TANKS $4,164 $2,400 n/a
WI0244 # 07 Y:1995 07 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,594 $500 n/a
WI0244 # 08 Y:1995 08 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $504 $0 n/a
WI0244 # 09 Y:1995 09 1995 INSTALL OCCUPANCY SENSORS $483 $225 n/a
WI0244 # 10 Y:1995 10 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $310 $631 n/a
UD0467 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $68,000 $72,000 Implemented
UD0467 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,434 $3,000 Implemented
UD0467 # 03 Y:1995 03 1995 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,135 $150,000 Not Implemented
SF0067 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,292 $6,960 Implemented
SF0067 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $375 $795 Implemented
SF0067 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $3,408 $1,478 Implemented
SF0067 # 04 Y:1995 04 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,075 $0 Implemented
SF0067 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $758 $450 Implemented
SF0067 # 06 Y:1995 06 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,872 $6,773 Not Implemented
SF0067 # 07 Y:1995 07 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $696 $850 Implemented
SF0067 # 08 Y:1995 08 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,803 $0 Implemented
UL0134 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,409 $40 n/a