IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0295 # 08 Y:2000 08 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $112 $130 Not Implemented
ME0295 # 09 Y:2000 09 2000 MAKE A NEW BY-PRODUCT $15,041 $21,330 Not Implemented
ME0295 # 10 Y:2000 10 2000 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $27,000 $1,512 Not Implemented
MO0286 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,671 $3,945 Implemented
MO0286 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,521 $118 Implemented
MO0286 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,722 $40 Implemented
MO0286 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $515 $0 Implemented
MO0286 # 05 Y:2000 05 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $7,535 $7,500 Not Implemented
MO0286 # 06 Y:2000 06 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,040 $0 Implemented
MO0286 # 07 Y:2000 07 2000 BURN WASTE OIL FOR HEAT $3,970 $3,500 Not Implemented
MO0286 # 08 Y:2000 08 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $3,650 $1,300 Implemented
MO0286 # 09 Y:2000 09 2000 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $5,360 $3,700 Implemented
OR0369 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,963 $8,640 Not Implemented
OR0369 # 02 Y:2000 02 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $199 $0 Not Implemented
IA0254 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,605 $18,341 Not Implemented
IA0254 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,391 $0 Not Implemented
IA0254 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $146 $665 Not Implemented
IA0254 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,021 $163 Not Implemented
IA0254 # 05 Y:2000 05 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,385 $170 Not Implemented
IA0254 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $977 $32 Not Implemented
IA0254 # 07 Y:2000 07 2000 DIRECT WARMEST AIR TO COMBUSTION INTAKE $316 $78 Not Implemented
IA0254 # 08 Y:2000 08 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $34,944 $38,000 Not Implemented
AS0282 # 01 Y:2000 01 2000 ADD AREA LIGHTING SWITCHES $3,618 $2,270 Not Implemented
AS0282 # 02 Y:2000 02 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $959 $120 Implemented
AS0282 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $697 $536 Implemented