IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0275 # 11 Y:2001 11 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $165,000 $42,000 Implemented
UM0193 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,099 $12,877 Not Implemented
UM0193 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,550 $3,000 Implemented
UM0193 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,556 $675 Implemented
UM0193 # 04 Y:2001 04 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,365 $1,000 Implemented
UM0193 # 05 Y:2001 05 2001 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $487 $1,000 Not Implemented
UM0193 # 06 Y:2001 06 2001 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $341 $200 Implemented
UM0193 # 07 Y:2001 07 2001 USE RADIANT HEATER FOR SPOT HEATING $942 $4,500 Not Implemented
UM0193 # 08 Y:2001 08 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,160 $2,060 Not Implemented
UM0193 # 09 Y:2001 09 2001 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $9,870 $11,000 Not Implemented
UM0193 # 10 Y:2001 10 2001 REDESIGN PROCESS $40,150 $2,500 Implemented
UM0193 # 11 Y:2001 11 2001 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $27,400 $1,000 Implemented
UM0193 # 12 Y:2001 12 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $26,010 $1,650 Not Implemented
UM0193 # 13 Y:2001 13 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $4,000 $4,200 Not Implemented
UF0275 # 01 Y:2001 01 2001 INSTALL COMMON HEADER ON COMPRESSORS $4,038 $4,300 Not Implemented
UF0275 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,164 $3,861 Not Implemented
UF0275 # 03 Y:2001 03 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,334 $30,000 Not Implemented
UF0275 # 04 Y:2001 04 2001 USE PHOTOCELL CONTROLS $7,800 $25,000 Implemented
UF0275 # 05 Y:2001 05 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,753 $1,025 Not Implemented
UF0275 # 06 Y:2001 06 2001 KEEP EQUIPMENT CLEAN $1,578 $252 Implemented
UF0275 # 07 Y:2001 07 2001 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $36,614 $72,000 Not Implemented
UF0275 # 08 Y:2001 08 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,648 $50 Implemented
UF0275 # 09 Y:2001 09 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $15,233 $8,000 Not Implemented
TA0010 # 01 Y:2001 01 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $69,210 $0 Implemented
TA0010 # 02 Y:2001 02 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $29,986 $11,995 Implemented