Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,302
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0641 # 03 Y:2008 | 03 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,028 | $3,000 | Implemented |
GT0850 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,544 | $1,580 | Not Implemented |
GT0850 # 01 Y:2008 | 01 | 2008 | COMBINE UTILITY METERS | $2,910 | $0 | Not Implemented |
GT0850 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,172 | $10,000 | Implemented |
GT0850 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,480 | $0 | Not Implemented |
GT0850 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,447 | $4,800 | Not Implemented |
GT0850 # 05 Y:2008 | 05 | 2008 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $23,045 | $29,000 | Not Implemented |
GT0850 # 06 Y:2008 | 06 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,700 | $20,540 | Not Implemented |
GT0850 # 07 Y:2008 | 07 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,170 | $12,600 | Not Implemented |
GT0850 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,237 | $7,000 | Not Implemented |
GT0850 # 09 Y:2008 | 09 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,982 | $40,482 | Not Implemented |
MI0166 # 01 Y:2008 | 01 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $360,093 | $695,000 | Not Implemented |
MI0166 # 02 Y:2008 | 02 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $70,996 | $1,200 | Implemented |
MI0166 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,899 | $41,800 | Implemented |
MI0166 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,060 | $1,210 | Implemented |
MI0166 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,713 | $40 | Implemented |
MI0166 # 06 Y:2008 | 06 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,677 | $3,475 | Not Implemented |
MA0631 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,384 | $27,090 | Implemented |
MA0631 # 02 Y:2008 | 02 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,021 | $0 | Implemented |
MA0631 # 03 Y:2008 | 03 | 2008 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $609 | $0 | Implemented |
MA0631 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $350 | $200 | Implemented |
IA0425 # 01 Y:2008 | 01 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $1,843 | $600 | Not Implemented |
IA0425 # 02 Y:2008 | 02 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,124 | $640 | Not Implemented |
IA0425 # 03 Y:2008 | 03 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $15,476 | $600 | Implemented |
IA0425 # 04 Y:2008 | 04 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $50,635 | $291,629 | Implemented |