Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,043
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0125 # 01 Y:2013 | 01 | 2013 | INSTALL OCCUPANCY SENSORS | $1,108 | $480 | Implemented |
MZ0125 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,168 | $9,300 | Implemented |
MZ0125 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,107 | $1,300 | Implemented |
SF0437 # 01 Y:2013 | 01 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $911 | $0 | Implemented |
SF0437 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $620 | $0 | Not Implemented |
SF0437 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $3,792 | $6,796 | Implemented |
SF0437 # 04 Y:2013 | 04 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $425 | $729 | Implemented |
SF0437 # 05 Y:2013 | 05 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $354 | $1,395 | Not Implemented |
SF0437 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,497 | $14,135 | Implemented |
SF0437 # 07 Y:2013 | 07 | 2013 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $28,111 | $46,338 | Not Implemented |
SF0437 # 08 Y:2013 | 08 | 2013 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $15,796 | $43,156 | Implemented |
SF0437 # 09 Y:2013 | 09 | 2013 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,489 | $13,500 | Implemented |
UM0428 # 01 Y:2013 | 01 | 2013 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $74,405 | $210,000 | Not Implemented |
UM0428 # 02 Y:2013 | 02 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,106 | $1,500 | Implemented |
UM0428 # 03 Y:2013 | 03 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $990 | $100 | Implemented |
UM0428 # 04 Y:2013 | 04 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $636 | $1,200 | Implemented |
UM0428 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,177 | $9,000 | Implemented |
UM0428 # 06 Y:2013 | 06 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,332 | $500 | Not Implemented |
OR0609 # 01 Y:2013 | 01 | 2013 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $13,082 | $4,037 | Not Implemented |
OR0609 # 02 Y:2013 | 02 | 2013 | INSULATE BARE EQUIPMENT | $4,347 | $4,299 | Not Implemented |
OR0609 # 03 Y:2013 | 03 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,555 | $4,200 | Not Implemented |
OR0609 # 04 Y:2013 | 04 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $6,499 | $5,792 | Not Implemented |
OR0609 # 05 Y:2013 | 05 | 2013 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $4,900 | $4,480 | Not Implemented |
OR0609 # 06 Y:2013 | 06 | 2013 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $142,102 | $374,500 | Not Implemented |
OR0609 # 07 Y:2013 | 07 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $117,782 | $160,770 | Implemented |