IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0125 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $1,108 $480 Implemented
MZ0125 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,168 $9,300 Implemented
MZ0125 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,107 $1,300 Implemented
SF0437 # 01 Y:2013 01 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $911 $0 Implemented
SF0437 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $620 $0 Not Implemented
SF0437 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $3,792 $6,796 Implemented
SF0437 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $425 $729 Implemented
SF0437 # 05 Y:2013 05 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $354 $1,395 Not Implemented
SF0437 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,497 $14,135 Implemented
SF0437 # 07 Y:2013 07 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $28,111 $46,338 Not Implemented
SF0437 # 08 Y:2013 08 2013 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $15,796 $43,156 Implemented
SF0437 # 09 Y:2013 09 2013 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,489 $13,500 Implemented
UM0428 # 01 Y:2013 01 2013 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $74,405 $210,000 Not Implemented
UM0428 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,106 $1,500 Implemented
UM0428 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $990 $100 Implemented
UM0428 # 04 Y:2013 04 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $636 $1,200 Implemented
UM0428 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,177 $9,000 Implemented
UM0428 # 06 Y:2013 06 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,332 $500 Not Implemented
OR0609 # 01 Y:2013 01 2013 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $13,082 $4,037 Not Implemented
OR0609 # 02 Y:2013 02 2013 INSULATE BARE EQUIPMENT $4,347 $4,299 Not Implemented
OR0609 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $3,555 $4,200 Not Implemented
OR0609 # 04 Y:2013 04 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $6,499 $5,792 Not Implemented
OR0609 # 05 Y:2013 05 2013 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $4,900 $4,480 Not Implemented
OR0609 # 06 Y:2013 06 2013 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $142,102 $374,500 Not Implemented
OR0609 # 07 Y:2013 07 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $117,782 $160,770 Implemented