IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0150 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $5,042 $5,250 Implemented
UU0150 # 07 Y:2019 07 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $3,861 $0 Implemented
UU0150 # 08 Y:2019 08 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,762 $3,762 Not Implemented
UU0150 # 09 Y:2019 09 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,385 $3,385 Not Implemented
UU0150 # 10 Y:2019 10 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,768 $1,756 Implemented
UU0150 # 11 Y:2019 11 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,570 $1,000 Implemented
UU0150 # 12 Y:2019 12 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,157 $950 Not Implemented
UU0150 # 13 Y:2019 13 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $921 $1,440 Not Implemented
AM0784 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $27,050 $32,150 Implemented
AM0784 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,100 $8,000 Implemented
AM0784 # 03 Y:2019 03 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,980 $1,400 Implemented
AM0784 # 04 Y:2019 04 2019 REPAIR AND ELIMINATE STEAM LEAKS $2,490 $100 Implemented
AM0784 # 05 Y:2019 05 2019 USE SYNTHETIC LUBRICANT $3,190 $1,050 Implemented
AM0784 # 06 Y:2019 06 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $340 $0 Implemented
AS0473 # 01 Y:2019 01 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,498 $1,790 Not Implemented
AS0473 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,930 $5,282 Not Implemented
AS0473 # 03 Y:2019 03 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,599 $9,044 Implemented
AS0473 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $1,975 $2,120 Not Implemented
AS0473 # 05 Y:2019 05 2019 REDUCE HEAT GAIN BY WINDOW TINTING $727 $400 Not Implemented
AS0473 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $647 $2,803 Implemented
AS0473 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $699 $1,891 Implemented
SU0481 # 01 Y:2019 01 2019 DISCONNECT BALLASTS $2,630 $0 Not Implemented
SU0481 # 02 Y:2019 02 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,034 $28 Implemented
SU0481 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $1,779 $1,023 Not Implemented
SU0481 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,137 $13,202 Implemented