IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,880

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0228 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $1,330 $2,040 Not Implemented
UU0228 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $389 $170 Not Implemented
UU0228 # 06 Y:2023 06 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $248 $255 Implemented
NL0083 # 01 Y:2023 01 2023 METER WASTE WATER $31,255 $151,280 Implemented
NL0083 # 02 Y:2023 02 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $18,134 $8,660 Implemented
NL0083 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,038 $4,600 Not Implemented
NL0083 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,182 $4,945 Implemented
NL0083 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $854 $2,700 Implemented
NL0083 # 06 Y:2023 06 2023 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $800 $1,548 Not Implemented
NL0083 # 07 Y:2023 07 2023 IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION $200 $2,040 Implemented
SD0642 # 01 Y:2023 01 2023 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $1,793 $2,300 Not Implemented
SD0642 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,958 $14,573 Not Implemented
SD0642 # 03 Y:2023 03 2023 USE MORE EFFICIENT ADHESIVE APPLICATORS $14,334 $2,200 Not Implemented
SD0642 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,070 $500 Not Implemented
SD0642 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $44,733 $141,268 Not Implemented
SD0642 # 06 Y:2023 06 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $4,384 $0 Not Implemented
SD0642 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $325 $847 Not Implemented
SD0642 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,872 $2,290 Not Implemented
SD0642 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,066 $5,607 Not Implemented
UD1062 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,907 $0 Not Implemented
UD1062 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,486 $0 Not Implemented
UD1062 # 03 Y:2023 03 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $705 $260 Not Implemented
UD1062 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $727 $952 Not Implemented
UD1062 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $342 $0 Not Implemented
UD1062 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $1,152 $2,000 Implemented