Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
12,007
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0519 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,990 | $19,331 | Not Implemented |
SF0519 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $9,168 | $23,469 | Implemented |
SF0519 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,309 | $55,280 | Not Implemented |
SF0519 # 08 Y:2018 | 08 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,974 | $34,820 | Not Implemented |
SF0519 # 09 Y:2018 | 09 | 2018 | RECYCLE WHITE WATER | $16,021 | $7,759 | Not Implemented |
SF0519 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,215 | $160 | Not Implemented |
SF0519 # 02 Y:2018 | 02 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $376 | $120 | Not Implemented |
SF0519 # 03 Y:2018 | 03 | 2018 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $29,348 | $20,000 | Not Implemented |
SD0562 # 01 Y:2018 | 01 | 2018 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $27,423 | $97,740 | Implemented |
SD0562 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,835 | $13,230 | Implemented |
SD0562 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,116 | $10,515 | Not Implemented |
SD0562 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,214 | $1,000 | Implemented |
SD0562 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,279 | $600 | Implemented |
SF0518 # 01 Y:2018 | 01 | 2018 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $13,874 | $3,023 | Not Implemented |
SF0518 # 02 Y:2018 | 02 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,220 | $4,857 | Not Implemented |
SF0518 # 03 Y:2018 | 03 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,611 | $15,000 | Not Implemented |
SF0518 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,777 | $2,300 | Not Implemented |
SF0518 # 05 Y:2018 | 05 | 2018 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $2,098 | $6,325 | Not Implemented |
SF0518 # 06 Y:2018 | 06 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,223 | $45,702 | Not Implemented |
SF0517 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,086 | $200 | Implemented |
SF0517 # 02 Y:2018 | 02 | 2018 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $284 | $100 | Not Implemented |
SF0517 # 03 Y:2018 | 03 | 2018 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,563 | $803 | Implemented |
SF0517 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,262 | $6,590 | Implemented |
SF0517 # 05 Y:2018 | 05 | 2018 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $14,634 | $50,965 | Implemented |
SF0517 # 06 Y:2018 | 06 | 2018 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $47,532 | $293,579 | Implemented |