Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0702 # 04 Y:2005 | 04 | 2005 | INSTALL SET-BACK TIMERS | $896 | $1,540 | Not Implemented |
OK0702 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $234 | $530 | Implemented |
OK0702 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $725 | $480 | Not Implemented |
OK0702 # 07 Y:2005 | 07 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,165 | $36,140 | Not Implemented |
OK0701 # 01 Y:2005 | 01 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $11,182 | $123,420 | Implemented |
OK0701 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,527 | $3,807 | Not Implemented |
OK0701 # 03 Y:2005 | 03 | 2005 | INSULATE BARE EQUIPMENT | $43,354 | $1,623 | Implemented |
OK0701 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,396 | $8,850 | Implemented |
OK0701 # 05 Y:2005 | 05 | 2005 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $19,082 | $13,500 | Not Implemented |
OK0701 # 06 Y:2005 | 06 | 2005 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $4,169 | $275 | Not Implemented |
OK0700 # 01 Y:2005 | 01 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $78,457 | $36,299 | Not Implemented |
OK0700 # 02 Y:2005 | 02 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $77,748 | $3,000 | Not Implemented |
OK0700 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,054 | $6,238 | Not Implemented |
OK0700 # 04 Y:2005 | 04 | 2005 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $293,585 | $1,110,000 | Not Implemented |
OK0700 # 05 Y:2005 | 05 | 2005 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $29,149 | $3,000 | Not Implemented |
OK0700 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,498 | $21,600 | Not Implemented |
OK0700 # 07 Y:2005 | 07 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $7,492 | $15,000 | Not Implemented |
OK0700 # 08 Y:2005 | 08 | 2005 | INSULATE BARE EQUIPMENT | $5,958 | $2,709 | Not Implemented |
OK0700 # 09 Y:2005 | 09 | 2005 | INSULATE BARE EQUIPMENT | $942 | $2,046 | Not Implemented |
OK0700 # 10 Y:2005 | 10 | 2005 | INSTALL SET-BACK TIMERS | $1,529 | $1,150 | Not Implemented |
OK0700 # 11 Y:2005 | 11 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,733 | $1,499 | Not Implemented |
OK0700 # 12 Y:2005 | 12 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $317 | $156 | Not Implemented |
OK0700 # 13 Y:2005 | 13 | 2005 | INSTALL OCCUPANCY SENSORS | $205 | $579 | Not Implemented |
OK0699 # 01 Y:2004 | 01 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $9,780 | $6,150 | Implemented |
OK0699 # 02 Y:2004 | 02 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $8,145 | $24,175 | Implemented |