IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,776

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0007 # 03 Y:2007 03 2007 USE COMPRESSOR AIR FILTERS $20,463 $2,000 Not Implemented
TT0007 # 04 Y:2007 04 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $38,638 $57,958 Not Implemented
TT0007 # 05 Y:2007 05 2007 REPAIR OR REPLACE STEAM TRAPS $13,341 $4,000 Not Implemented
TT0007 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,294 $480 Not Implemented
TT0007 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,892 $73,290 Not Implemented
TT0006 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,109 $2,900 Implemented
TT0006 # 02 Y:2007 02 2007 USE COMPRESSOR AIR FILTERS $7,465 $4,240 Implemented
TT0006 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,910 $164,448 Not Implemented
TT0006 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,827 $4,514 Not Implemented
TT0004 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $20,486 $2,500 Implemented
TT0004 # 02 Y:2007 02 2007 INSULATE FEEDWATER TANK $654 $500 Implemented
TT0004 # 03 Y:2007 03 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,491 $0 Implemented
TT0004 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $402 $0 Implemented
TT0004 # 05 Y:2007 05 2007 REPAIR OR REPLACE STEAM TRAPS $557 $0 Not Implemented
TT0005 # 01 Y:2007 01 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,913 $7,515 Not Implemented
TT0005 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,570 $4,816 Implemented
TT0005 # 03 Y:2007 03 2007 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,206 $400 Not Implemented
TT0005 # 04 Y:2007 04 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $864 $4,080 Not Implemented
TT0005 # 05 Y:2007 05 2007 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,002 $200 Implemented
TT0005 # 06 Y:2007 06 2007 OPTIMIZE PLANT POWER FACTOR $62,060 $50,000 Implemented
TT0005 # 07 Y:2007 07 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,808 $5,060 Not Implemented
TT0005 # 08 Y:2007 08 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $47,304 $2,000 Implemented
TT0005 # 09 Y:2007 09 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,245 $44,608 Not Implemented
TT0003 # 01 Y:2007 01 2007 OPTIMIZE PLANT POWER FACTOR $9,260 $30,000 Not Implemented
TT0003 # 02 Y:2007 02 2007 REPLACE BOILER $1,896 $15,000 Not Implemented