Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,130
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0044 # 04 Y:1993 | 04 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $145 | $300 | Not Implemented |
HO0044 # 05 Y:1993 | 05 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,607 | $2,200 | Not Implemented |
HO0044 # 06 Y:1993 | 06 | 1993 | MOVE BOILER TO MORE EFFICIENT LOCATION | $567 | $274 | Not Implemented |
IA0058 # 01 Y:1993 | 01 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,306 | $1,000 | Implemented |
IA0058 # 02 Y:1993 | 02 | 1993 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $416 | $1,200 | Not Implemented |
IA0058 # 03 Y:1993 | 03 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,091 | $4,600 | Implemented |
IA0058 # 04 Y:1993 | 04 | 1993 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $88,602 | $95,000 | Not Implemented |
IA0058 # 05 Y:1993 | 05 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $13,994 | $250 | Implemented |
IA0058 # 06 Y:1993 | 06 | 1993 | INSTALL OCCUPANCY SENSORS | $4,847 | $1,899 | Not Implemented |
IA0058 # 07 Y:1993 | 07 | 1993 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $7,910 | $30,000 | Not Implemented |
IA0058 # 08 Y:1993 | 08 | 1993 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $537 | $1,100 | Not Implemented |
ND0161 # 01 Y:1993 | 01 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,842 | $840 | Implemented |
ND0161 # 02 Y:1993 | 02 | 1993 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,238 | $675 | Not Implemented |
ND0161 # 03 Y:1993 | 03 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $535 | $661 | Not Implemented |
ND0161 # 04 Y:1993 | 04 | 1993 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $578 | $1,660 | Not Implemented |
ND0161 # 05 Y:1993 | 05 | 1993 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $527 | $80 | Implemented |
ND0161 # 06 Y:1993 | 06 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28 | $40 | Not Implemented |
AS0091 # 01 Y:1993 | 01 | 1993 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,875 | $3,800 | Not Implemented |
AS0091 # 02 Y:1993 | 02 | 1993 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,516 | $0 | Implemented |
AS0091 # 03 Y:1993 | 03 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $27 | $141 | Implemented |
AS0091 # 04 Y:1993 | 04 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $150 | $110 | Implemented |
AS0091 # 05 Y:1993 | 05 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $223 | $500 | Not Implemented |
AS0091 # 06 Y:1993 | 06 | 1993 | USE SYNTHETIC LUBRICANT | $95 | $0 | Not Implemented |
AS0091 # 07 Y:1993 | 07 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,223 | $2,074 | Not Implemented |
AS0091 # 08 Y:1993 | 08 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,767 | $4,293 | Not Implemented |