IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0304 # 08 Y:2002 08 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $6,906 $600 Not Implemented
UF0305 # 01 Y:2002 01 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,112 $0 Implemented
UF0305 # 02 Y:2002 02 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,516 $7,336 Implemented
UF0305 # 03 Y:2002 03 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $6,111 $27,450 Not Implemented
UF0305 # 04 Y:2002 04 2002 REPAIR AND ELIMINATE STEAM LEAKS $9,803 $75 Implemented
UF0305 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,910 $0 Implemented
UF0305 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,207 $4,727 Not Implemented
UF0305 # 07 Y:2002 07 2002 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $70,992 $25,725 Not Implemented
UF0305 # 08 Y:2002 08 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,340 $1,740 Not Implemented
MI0046 # 01 Y:2002 01 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $74,250 $5,460 Not Implemented
MI0046 # 02 Y:2002 02 2002 INSTALL BACK-UP EQUIPMENT $27,428 $936 Implemented
MI0046 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,162 $1,016 Implemented
MI0046 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,120 $1,068 Implemented
MI0046 # 05 Y:2002 05 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,998 $8 Implemented
BD0215 # 01 Y:2002 01 2002 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $20,511 $4,000 Implemented
BD0215 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,289 $1,500 Not Implemented
BD0215 # 03 Y:2002 03 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,792 $12,000 Not Implemented
BD0215 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $1,820 $1,875 Not Implemented
BD0215 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,290 $1,000 Not Implemented
BD0215 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $779 $0 Not Implemented
BD0215 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $562 $400 Implemented
BD0215 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $482 $334 Not Implemented
BD0215 # 09 Y:2002 09 2002 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $43,076 $3,400 Not Implemented
BD0215 # 10 Y:2002 10 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $17,159 $18,000 Not Implemented
BD0215 # 11 Y:2002 11 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,300 $102 Not Implemented