IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0545 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,889 $30,733 Implemented
NC0545 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $468 $278 Implemented
NC0545 # 11 Y:2015 11 2015 INSTALL OCCUPANCY SENSORS $261 $497 Not Implemented
NC0545 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $189 $48 Implemented
NC0545 # 13 Y:2015 13 2015 USE PHOTOCELL CONTROLS $1,636 $700 Not Implemented
NC0545 # 14 Y:2015 14 2015 REDUCE FLUID FLOW RATES $8,008 $11,000 Not Implemented
NC0545 # 15 Y:2015 15 2015 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,331 $14,100 Not Implemented
NC0545 # 16 Y:2015 16 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $192 $221 Not Implemented
NC0545 # 17 Y:2015 17 2015 RECOVER WASTE HEAT FROM EQUIPMENT $218 $100 Not Implemented
NC0545 # 18 Y:2015 18 2015 DEVELOP A REPAIR/REPLACE POLICY $1,205 $4,256 Implemented
NC0545 # 19 Y:2015 19 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,003 $93 Not Implemented
SD0512 # 01 Y:2015 01 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,138 $61,820 Not Implemented
SD0512 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $39,697 $25,608 Implemented
SD0512 # 03 Y:2015 03 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,185 $45,900 Implemented
SD0512 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,532 $800 Implemented
SD0512 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $3,224 $2,850 Implemented
SD0512 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,985 $5,247 Implemented
MI0282 # 01 Y:2015 01 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $23,744 $1,120 Not Implemented
MI0282 # 02 Y:2015 02 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,822 $10,322 Implemented
MI0282 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,613 $1,660 Implemented
MI0282 # 04 Y:2015 04 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,005 $1,220 Not Implemented
MI0282 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,694 $40 Not Implemented
MI0282 # 06 Y:2015 06 2015 REDUCE HEAT GAIN BY WINDOW TINTING $3,779 $16,060 Not Implemented
MI0282 # 07 Y:2015 07 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,378 $40 Implemented
MI0282 # 08 Y:2015 08 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,655 $1,080 Implemented